estimatedCost

P4259
predicate

Indicates the predicted or calculated monetary amount expected to be required for something, such as a project, item, or action.

All labels observed (55)

Label Occurrences
projectCost 31
estimatedCost canonical 27
renovationCost 24

Description generation (PDg)

The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.

Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning.  
# Instructions
Focus on describing the relationship, not the entities themselves. 
# Response Format
Begin the description with \' Indicates...\'
Input
Predicate: estimatedCost
Generated description
Indicates the predicted or calculated monetary amount expected to be required for something, such as a project, item, or action.

Sample triples (158)

Subject Object
Battle of B-R5RB over 11 trillion ISK via predicate surface "estimatedEconomicCost"
Battle of B-R5RB equivalent to hundreds of thousands of US dollars at the time via predicate surface "estimatedEconomicCost"
Cần Thơ Bridge approximately 480 million US dollars via predicate surface "projectCost"
Great Western Forum approximately $100 million via predicate surface "renovationCost"
L.A. Forum approximately 100 million US dollars via predicate surface "renovationCost"
Hudson Theatre, Broadway
surface form: Hudson Theatre
over $20 million via predicate surface "renovationCost"
Spider-Man: Turn Off the Dark approximately 75 million US dollars via predicate surface "estimatedBudget"
Juno approximately 1.1 billion USD via predicate surface "missionCost"
Margaret Hunt Hill Bridge approximately 120 million US dollars via predicate surface "projectCost"
Cornerstone database
surface form: Cornerstone
high development cost via predicate surface "developmentCost"
Kemper Project power plant approximately 2.4 billion US dollars via predicate surface "estimatedInitialCost"
Kemper Project power plant over 7 billion US dollars via predicate surface "estimatedFinalCost"
Lyric Theatre, Belfast approximately £18.1 million via predicate surface "redevelopmentCost"
Royal Commonwealth Pool approximately £37 million via predicate surface "renovationCost"
Fernald uranium plant approximately 4.4 billion U.S. dollars via predicate surface "cleanupCost"
University of Dayton Arena $72 million (2017–2019 renovation) via predicate surface "renovationCost"
Nkandla homestead scandal over 200 million South African rand
Nkandla homestead scandal over 20 million US dollars (approximate)
Robby the Robot approximately 125000 US dollars via predicate surface "propCost"
Labrador–Island Link several billion Canadian dollars via predicate surface "projectCost"
ITER project tens of billions of euros
United Nations Transitional Authority in Cambodia approximately 1.6 billion US dollars via predicate surface "budgetEstimate"
Colton Crossing approximately 202 million US dollars via predicate surface "projectCost"
Attack-class submarine tens of billions of Australian dollars via predicate surface "programCostEstimate"
Nachtigal Hydropower Project approximately 1.2 billion euros
Nachtigal Hydropower Project over 1.3 billion US dollars
NASA Stardust mission
surface form: Stardust
approximately 300 million US dollars via predicate surface "missionCost"
Kingston coal ash spill of 2008 over 1 billion U.S. dollars via predicate surface "estimatedCleanupCost"
Foolish Wives over 1,000,000 US dollars via predicate surface "estimatedBudget"
Point State Park Fountain approximately 9.6 million US dollars via predicate surface "renovationCost"
Ichthys LNG development over 30 billion US dollars via predicate surface "capitalCostEstimate"
Volkswagen emissions scandal (certain generations)
surface form: Volkswagen emissions scandal
tens of billions of euros via predicate surface "totalCostsEstimate"
Fehmarnbelt Tunnel over 7 via predicate surface "estimatedCostInBillionEUR"
Trident successor programme tens of billions of pounds via predicate surface "estimatedCostCategory"
St. Croix Crossing approximately 646 million USD via predicate surface "projectCost"
H.R. 748 approximately $2.2 trillion
South–North Water Transfer Project hundreds of billions of yuan
Majura Parkway approximately A$288 million via predicate surface "projectCost"
Mead Center for American Theater $135 million via predicate surface "renovationCost"
Main Building, Whitehall approximately £350 million via predicate surface "renovationCost"
The Shops at Kenilworth approximately $20 million via predicate surface "renovationCost"
The Big Show
surface form: The Big Show (radio program)
high-budget via predicate surface "productionCost"
Kashagan oil field tens of billions of US dollars via predicate surface "projectCost"
The Curragh racecourse €80 million (approximate) via predicate surface "redevelopmentCost"
Jewel Changi Airport 1.7 billion Singapore dollars
Westfield Newmarket (Auckland) NZ$790 million via predicate surface "redevelopmentCost"
PNG LNG project approximately 19 billion US dollars via predicate surface "capitalCost"
National Indoor Arena 26000000 GBP via predicate surface "renovationCost"
Phantasmagoria high for its time via predicate surface "approximateBudget"
Tax Relief, Unemployment Insurance Reauthorization, and Job Creation Act of 2010 hundreds of billions of U.S. dollars over ten years