estimatedCost

P4259
predicate

Indicates the predicted or calculated monetary amount expected to be required for something, such as a project, item, or action.

All labels observed (55)

Label Occurrences
projectCost 31
estimatedCost canonical 27
renovationCost 24

Description generation (PDg)

The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.

Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning.  
# Instructions
Focus on describing the relationship, not the entities themselves. 
# Response Format
Begin the description with \' Indicates...\'
Input
Predicate: estimatedCost
Generated description
Indicates the predicted or calculated monetary amount expected to be required for something, such as a project, item, or action.

Sample triples (158)

Subject Object
Coronavirus Job Retention Scheme around 14 billion GBP via predicate surface "peakMonthlyCostEstimate"
Coronavirus Job Retention Scheme tens of billions of GBP via predicate surface "totalCostEstimate"
Rocky Flats Plant (historical)
surface form: Rocky Flats Plant
approximately $7 billion via predicate surface "cleanupCost"
The Kelpies approximately £5 million via predicate surface "projectCost"
Parker Solar Probe approximately 1.5 billion US dollars via predicate surface "missionCost"
Tacoma Dome approximately $30 million via predicate surface "renovationCost"
PortMiami Tunnel approximately 1 billion US dollars via predicate surface "projectCost"
2026 Commonwealth Games 2.6 billion (initial public estimate) via predicate surface "originalEstimatedCostAUD"
Exxon Valdez oil spill billions of US dollars via predicate surface "cleanupCost"
Moynihan Train Hall approximately 1.6 billion US dollars via predicate surface "projectCost"
Silverado Savings and Loan approximately 1 billion U.S. dollars via predicate surface "estimatedCostToFSLIC"
Grand Ethiopian Renaissance Dam approximately 4.8 billion US dollars via predicate surface "estimatedConstructionCost"
Apple "1984" commercial approximately $370,000 via predicate surface "productionCost"
1984 (television commercial) approximately $800,000 for Super Bowl airtime via predicate surface "mediaBuyCost"
Ridley Island Propane Export Terminal approximately CAD 500 million via predicate surface "projectCost"
McCarren Park Pool 50000000 USD via predicate surface "renovationCost"
Oakland Airport Connector hundreds of millions of US dollars via predicate surface "projectCost"
Beijing–Shanghai High-Speed Railway over 200 billion yuan via predicate surface "projectCost"
Dreadnought-class nuclear-powered ballistic missile submarines tens of billions of pounds sterling via predicate surface "programmeCostEstimate"
Gravity Probe B experiment
surface form: Gravity Probe B
approximately 750 million US dollars via predicate surface "missionCost"
Hell's Angels (1930 film) approximately $4,000,000 via predicate surface "productionCost"
Grand Central LIRR terminal over 10 billion US dollars via predicate surface "projectCost"
Fertitta Center $60 million via predicate surface "renovationCost"
Larry Fortensky approximately $1.5 million via predicate surface "weddingCostEstimate"
Kia Forum approximately 100 million US dollars via predicate surface "renovationCost"
ICC Sydney A$1.5 billion via predicate surface "developmentCost"
Hinkley Point nuclear power stations
surface form: Hinkley Point C nuclear power station
over 20 billion via predicate surface "estimatedCost_GBP"
Adelaide–Darwin railway about A$1.2 billion via predicate surface "constructionCostApproximate"
Karuma Hydropower Station approximately US$1.7 billion
Central Artery/Tunnel Project approximately 2.6 billion US dollars via predicate surface "estimatedCostAtApproval"
National Shipbuilding Procurement Strategy tens of billions of Canadian dollars
Special Counsel investigation into Russian interference in the 2016 United States elections 34 million US dollars via predicate surface "budgetApproximate"
The Forum (Inglewood, California) approximately $100 million via predicate surface "renovationCost"
Hunter Expressway approximately A$1.7 billion via predicate surface "projectCost"
American Recovery and Reinvestment Act of 2009 787 billion US dollars
American Recovery and Reinvestment Act of 2009 831 billion US dollars
Kafue Gorge Lower Power Station approximately US$2 billion
Sixth Street Viaduct approximately 588 million USD via predicate surface "projectCost"
Vanderbilt costume ball of 1883 about 250000 US dollars
Jeddah Tower over 1 billion US dollars
The Pacific (miniseries)
surface form: The Pacific
approximately 200 million US dollars via predicate surface "productionCost"
Shenmue high production budget via predicate surface "estimatedBudget"
Karot Hydropower Project approximately US$1.7 billion via predicate surface "projectCost"
Orange Line Metro Train Lahore approximately US$1.6 billion via predicate surface "projectCost"
CA/T approximately $2.6 billion via predicate surface "estimatedCostAtApproval"
CA/T over $14 billion via predicate surface "finalCostEstimate"
Al Boraq approximately 2 billion euros via predicate surface "projectCost"
savings and loan crisis of the 1980s hundreds of billions of U.S. dollars via predicate surface "approximateCostToTaxpayers"
savings and loan crisis of the 1980s about 124 billion U.S. dollars in direct taxpayer costs via predicate surface "approximateCostToTaxpayers"
savings and loan crisis of the 1980s around 160 billion U.S. dollars via predicate surface "totalResolutionCostEstimate"