Triple
T21616581
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kemper Project power plant |
E533457
|
entity |
| Predicate | estimatedInitialCost |
P4259
|
FINISHED |
| Object | approximately 2.4 billion US dollars |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 2.4 billion US dollars | Statement: [Kemper Project power plant, estimatedInitialCost, approximately 2.4 billion US dollars]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: estimatedInitialCost Context triple: [Kemper Project power plant, estimatedInitialCost, approximately 2.4 billion US dollars]
-
A.
estimatedCost
chosen
Indicates the predicted or calculated monetary amount expected to be required for something, such as a project, item, or action.
-
B.
economicCost
Indicates the financial burden, expense, or resource expenditure associated with an action, event, or relationship between entities.
-
C.
acquisitionCost
Indicates the monetary amount or value required to obtain or purchase an entity.
-
D.
estimatedCostComment
Indicates a textual note or explanation associated with an estimated cost, such as rationale, assumptions, or additional details about that estimate.
-
E.
estimatedDevelopmentCostCurrency
Indicates the currency in which the estimated development cost is expressed.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c46411108190bba0d4176dffc9f3 |
completed | April 16, 2026, 11:13 a.m. |
| NER | Named-entity recognition | batch_69ef3bab865081908bc7d7b1824415ac |
completed | April 27, 2026, 10:34 a.m. |
| PD | Predicate disambiguation | batch_69e69665fe8c8190af7e38785db188b2 |
completed | April 20, 2026, 9:11 p.m. |
Created at: April 16, 2026, 6:33 p.m.