The Kemper Project power plant is a controversial, partially abandoned integrated gasification combined cycle (IGCC) power facility in Mississippi that became known for massive cost overruns and the failure of its “clean coal” technology ambitions.

Try in SPARQL Jump to: Statements Referenced by

Statements (49)

Predicate Object
instanceOf energy infrastructure project
integrated gasification combined cycle power plant
power plant
actualGasificationAbandonmentDate 2017
announced around 2006
constructionStartDate 2010
costOverrun more than 4 billion US dollars above initial estimate
country United States of America
surface form: United States
criticizedFor being an example of clean coal technology risk
high costs to consumers
technical failures of gasification system
currentPrimaryFuel natural gas
designedToCapture carbon dioxide
designedToSell captured carbon dioxide for enhanced oil recovery
designedToUse locally mined lignite
environmentalClaim intended to significantly reduce CO2 emissions compared to conventional coal plants
estimatedFinalCost over 7 billion US dollars
estimatedInitialCost approximately 2.4 billion US dollars
fuelTypePlanned lignite coal
natural gas
gasificationTechnologyDeveloper KBR NERFINISHED
Southern Company NERFINISHED
gasificationTechnologyType transport integrated gasification (TRIG)
hasPlannedCapacity about 582 MW net electric output
approximately 582 megawatts
hasProjectType clean coal project
demonstration project
initialPlannedCompletion 2014
locatedIn Kemper County, Mississippi NERFINISHED
Mississippi NERFINISHED
United States of America
surface form: United States
notableFor construction delays
controversy over ratepayer costs
failure of gasification and carbon capture systems to enter commercial operation
massive cost overruns
originalConcept clean coal power plant with carbon capture
ownedBy Mississippi Power NERFINISHED
parentCompanyOfOwner Southern Company NERFINISHED
receivedFederalSupportFrom U.S. Department of Energy NERFINISHED
receivedFederalSupportType clean coal demonstration funding
regulator Mississippi Public Service Commission NERFINISHED
regulatoryOutcome Mississippi Public Service Commission ordered end of coal gasification portion in 2017 NERFINISHED
status operates as natural gas combined cycle plant only
partially abandoned
technologyType carbon capture and storage
integrated gasification combined cycle
usedAsCaseStudyIn economic viability of clean coal technologies
energy policy debates
project management failures in large infrastructure

Referenced by (1)

Full triples — surface form annotated when it differs from this entity's canonical label.

Kemper County, Mississippi, United States containsFacility Kemper Project power plant
subject surface form: Kemper County, Mississippi