Triple

T21616566
Position Surface form Disambiguated ID Type / Status
Subject Kemper Project power plant E533457 entity
Predicate initialPlannedCompletion P127678 FINISHED
Object 2014 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2014 | Statement: [Kemper Project power plant, initialPlannedCompletion, 2014]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: initialPlannedCompletion
Context triple: [Kemper Project power plant, initialPlannedCompletion, 2014]
  • A. originalCompletionDate
    Indicates the date on which something was first completed, before any subsequent changes, revisions, or updates.
  • B. datePlanned
    Indicates that a specific date has been scheduled or intended for a particular event, action, or relationship to occur.
  • C. plannedAt
    Indicates that an event, action, or activity is scheduled or intended to occur at a specific time or date.
  • D. plannedEndYear chosen
    Indicates the calendar year in which an activity, project, or plan is intended or scheduled to be completed.
  • E. estimatedStartDate
    Indicates the date on which something is expected or planned to begin, based on current information or projections.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46411108190bba0d4176dffc9f3 completed April 16, 2026, 11:13 a.m.
NER Named-entity recognition batch_69ef3bab865081908bc7d7b1824415ac completed April 27, 2026, 10:34 a.m.
PD Predicate disambiguation batch_69e69665fe8c8190af7e38785db188b2 completed April 20, 2026, 9:11 p.m.
Created at: April 16, 2026, 6:33 p.m.