Triple
T21616550
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kemper Project power plant |
E533457
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | integrated gasification combined cycle power plant |
C14265
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: integrated gasification combined cycle power plant Context triple: [Kemper Project power plant, instanceOf, integrated gasification combined cycle power plant]
-
A.
coal-fired power station
A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
-
B.
electric power station
chosen
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
C.
wind power plant
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
-
D.
gas turbine engine
A gas turbine engine is a continuous-flow internal combustion engine that compresses air, mixes it with fuel, burns the mixture, and expands the hot gases through turbine and nozzle stages to produce mechanical power or thrust.
-
E.
hydro-wind power plant
A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e0c46411108190bba0d4176dffc9f3 |
completed | April 16, 2026, 11:13 a.m. |
Created at: April 16, 2026, 6:33 p.m.