Triple

T21616550
Position Surface form Disambiguated ID Type / Status
Subject Kemper Project power plant E533457 entity
Predicate instanceOf P0 FINISHED
Object integrated gasification combined cycle power plant C14265 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: integrated gasification combined cycle power plant
Context triple: [Kemper Project power plant, instanceOf, integrated gasification combined cycle power plant]
  • A. coal-fired power station
    A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
  • B. electric power station chosen
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • C. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • D. gas turbine engine
    A gas turbine engine is a continuous-flow internal combustion engine that compresses air, mixes it with fuel, burns the mixture, and expands the hot gases through turbine and nozzle stages to produce mechanical power or thrust.
  • E. hydro-wind power plant
    A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e0c46411108190bba0d4176dffc9f3 completed April 16, 2026, 11:13 a.m.
Created at: April 16, 2026, 6:33 p.m.