Sangtuda 1 Dam

E604717

Sangtuda 1 Dam is a major hydroelectric power station in Tajikistan that plays a key role in the country’s electricity generation.

Try in SPARQL Jump to: Statements Referenced by

Statements (46)

Predicate Object
instanceOf gravity dam
hydroelectric power station
annualGeneration approximately 2.7 TWh
commissioningDate 2010
connectedProject Vakhsh cascade hydropower development NERFINISHED
constructionStartDate 2005
constructionType concrete gravity dam
country Tajikistan NERFINISHED
damHeight about 75 m
damLength about 517 m
distanceFromDushanbe approximately 160 km southeast
firstUnitCommissioningDate January 2008
generatorCapacity 167.5 MW
gridConnection Tajik national grid
hasPowerhouseLocation at dam toe
impact reduces electricity shortages in Tajikistan
installedCapacity 670 MW
locatedIn Danghara District NERFINISHED
locatedOnRiver Vakhsh River NERFINISHED
nearCity Bokhtar NERFINISHED
Sangtuda NERFINISHED
numberOfGenerators 4
numberOfTurbines 4
operator Sangtudinskaya GES-1 NERFINISHED
owner Government of Tajikistan NERFINISHED
Russian Federation entities
ownershipStructure joint Tajik–Russian venture
partOf Tajikistan energy infrastructure
Vakhsh River cascade NERFINISHED
plantType run-of-river with reservoir
primaryFuel hydropower
projectPartners Russia NERFINISHED
Tajikistan NERFINISHED
purpose electricity generation
grid stabilization
region Central Asia
reservoirTotalCapacity about 258 million m3
roleInEconomy key asset for Tajikistan energy security
roleInExports potential contributor to regional power exports
significance important for winter power generation in Tajikistan
major contributor to Tajikistan electricity supply
spillwayType gated overflow spillway
status operational
turbineCapacity 167.5 MW
turbineType Francis turbine
waterSource Vakhsh River NERFINISHED

Referenced by (1)

Full triples — surface form annotated when it differs from this entity's canonical label.

Vakhsh River hasHydropowerDam Sangtuda 1 Dam