Triple

T6554780
Position Surface form Disambiguated ID Type / Status
Subject Vakhsh River E152418 entity
Predicate hasHydropowerDam P15311 FINISHED
Object Sangtuda 1 Dam
Sangtuda 1 Dam is a major hydroelectric power station in Tajikistan that plays a key role in the country’s electricity generation.
E604717 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sangtuda 1 Dam | Statement: [Vakhsh River, hasHydropowerDam, Sangtuda 1 Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sangtuda 1 Dam
Context triple: [Vakhsh River, hasHydropowerDam, Sangtuda 1 Dam]
  • A. Mula Dam
    Mula Dam is a major irrigation and water-supply dam built on the Mula River in Maharashtra, India.
  • B. Dhom Dam
    Dhom Dam is a major masonry dam in Maharashtra, India, built on the Krishna River to provide irrigation, drinking water, and hydroelectric power.
  • C. Thein Dam
    Thein Dam, also known as Ranjit Sagar Dam, is a major multipurpose hydroelectric and irrigation dam located on the Ravi River in northern India.
  • D. Pandoh Dam
    Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
  • E. Pracana Dam
    Pracana Dam is a hydroelectric and water management dam located on the Ocreza River in central Portugal, contributing to the regulation and use of resources in the Tagus River basin.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Sangtuda 1 Dam
Triple: [Vakhsh River, hasHydropowerDam, Sangtuda 1 Dam]
Generated description
Sangtuda 1 Dam is a major hydroelectric power station in Tajikistan that plays a key role in the country’s electricity generation.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Sangtuda 1 Dam
Target entity description: Sangtuda 1 Dam is a major hydroelectric power station in Tajikistan that plays a key role in the country’s electricity generation.
  • A. Mula Dam
    Mula Dam is a major irrigation and water-supply dam built on the Mula River in Maharashtra, India.
  • B. Dhom Dam
    Dhom Dam is a major masonry dam in Maharashtra, India, built on the Krishna River to provide irrigation, drinking water, and hydroelectric power.
  • C. Thein Dam
    Thein Dam, also known as Ranjit Sagar Dam, is a major multipurpose hydroelectric and irrigation dam located on the Ravi River in northern India.
  • D. Pandoh Dam
    Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
  • E. Pracana Dam
    Pracana Dam is a hydroelectric and water management dam located on the Ocreza River in central Portugal, contributing to the regulation and use of resources in the Tagus River basin.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c688058d6881908c19b309cc55dbfa completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6ae1c07cc819089c297edad943a57 completed March 27, 2026, 4:19 p.m.
NED1 Entity disambiguation (via context triple) batch_69c6d55707d081908104f08e1d59d603 completed March 27, 2026, 7:07 p.m.
NEDg Description generation batch_69c6d67574cc8190acf20c1a598c32ee completed March 27, 2026, 7:11 p.m.
NED2 Entity disambiguation (via description) batch_69c6d84076d48190ada0903af49613de completed March 27, 2026, 7:19 p.m.
Created at: March 27, 2026, 1:51 p.m.