installedCapacity
P11312
predicate
Indicates the maximum output or production capability that has been set up or built for a system, facility, or equipment, typically measured under specified conditions.
Observed surface forms (3)
- installedCapacity_MW ×2
- designedNetCapacity ×1
- nameplateCapacity ×1
Sample triples (33)
| Subject | Object |
|---|---|
| Aswan High Dam | 2100 megawatts ⓘ |
| Atatürk Dam | 2400 MW ⓘ |
| Bargi Dam | 90 MW ⓘ |
| Cahora Bassa Dam | about 2075 MW ⓘ |
| Calvert Cliffs Nuclear Power Plant | approximately 1735 MWe via predicate surface "designedNetCapacity" ⓘ |
| Chief Joseph Dam | 2620 MW ⓘ |
| Gariep Dam | approximately 360 MW ⓘ |
| Gezhouba Dam | 2715 MW ⓘ |
| Hoover Dam | about 2,080 MW ⓘ |
| Indira Sagar Dam | 1000 MW ⓘ |
| Itaipu Dam | 14000 via predicate surface "installedCapacity_MW" ⓘ |
| Itezhi-Tezhi Dam | 120 MW ⓘ |
| Jurala Dam | 234 MW ⓘ |
| Keban Dam | 1,330 MW ⓘ |
| Kentucky Dam | approximately 223 MW ⓘ |
| McNary Dam | 980 MW ⓘ |
| Melton Hill Dam | approximately 79 MW ⓘ |
| Nagarjuna Sagar Dam | hydroelectric power station of several hundred megawatts ⓘ |
| New Melones Dam | about 300 megawatts ⓘ |
| Norris Dam | approximately 131 megawatts ⓘ |
| Omkareshwar Dam | 520 MW ⓘ |
| Ormonde Offshore Wind Farm | 150 MW via predicate surface "nameplateCapacity" ⓘ |
| Oroville Dam | approximately 819 megawatts ⓘ |
| Ranjit Sagar Dam | 600 MW ⓘ |
| Sardar Sarovar Dam | 1450 via predicate surface "installedCapacity_MW" ⓘ |
| Shasta Dam | about 676 MW ⓘ |
| Snowy Hydro Scheme | about 4100 MW ⓘ |
| Tabqa Dam | about 824 MW ⓘ |
| Tarbela Dam | over 4,800 megawatts ⓘ |
| The Dalles Dam | over 1,800 megawatts ⓘ |
| Thein Dam | 600 MW ⓘ |
| Three Gorges Dam | 22500 MW ⓘ |
| Yacyretá Dam | 3100 MW ⓘ |