installedCapacity

P11312 predicate

Indicates the maximum output or production capability that has been set up or built for a system, facility, or equipment, typically measured under specified conditions.

Observed surface forms (3)

  • installedCapacity_MW ×2
  • designedNetCapacity ×1
  • nameplateCapacity ×1

Sample triples (33)

Subject Object
Aswan High Dam 2100 megawatts
Atatürk Dam 2400 MW
Bargi Dam 90 MW
Cahora Bassa Dam about 2075 MW
Calvert Cliffs Nuclear Power Plant approximately 1735 MWe via predicate surface "designedNetCapacity"
Chief Joseph Dam 2620 MW
Gariep Dam approximately 360 MW
Gezhouba Dam 2715 MW
Hoover Dam about 2,080 MW
Indira Sagar Dam 1000 MW
Itaipu Dam 14000 via predicate surface "installedCapacity_MW"
Itezhi-Tezhi Dam 120 MW
Jurala Dam 234 MW
Keban Dam 1,330 MW
Kentucky Dam approximately 223 MW
McNary Dam 980 MW
Melton Hill Dam approximately 79 MW
Nagarjuna Sagar Dam hydroelectric power station of several hundred megawatts
New Melones Dam about 300 megawatts
Norris Dam approximately 131 megawatts
Omkareshwar Dam 520 MW
Ormonde Offshore Wind Farm 150 MW via predicate surface "nameplateCapacity"
Oroville Dam approximately 819 megawatts
Ranjit Sagar Dam 600 MW
Sardar Sarovar Dam 1450 via predicate surface "installedCapacity_MW"
Shasta Dam about 676 MW
Snowy Hydro Scheme about 4100 MW
Tabqa Dam about 824 MW
Tarbela Dam over 4,800 megawatts
The Dalles Dam over 1,800 megawatts
Thein Dam 600 MW
Three Gorges Dam 22500 MW
Yacyretá Dam 3100 MW