installedCapacity
P11312
predicate
Indicates the maximum output or production capability that has been set up or built for a system, facility, or equipment, typically measured under specified conditions.
All labels observed (18)
| Label | Occurrences |
|---|---|
| installedCapacity canonical | 302 |
| installedCapacity_MW | 8 |
| nameplateCapacity | 4 |
| hasInstalledCapacity | 3 |
| originalInstalledCapacity | 3 |
| designedInstalledCapacity | 2 |
| installedCapacityMW | 2 |
| plannedInstalledCapacity | 2 |
| totalInstalledCapacity | 2 |
| claimedInstalledCapacity | 1 |
| cumulativeInstalledCapacity | 1 |
| designCapacityLNG | 1 |
| designedCapacityDescription | 1 |
| designedNetCapacity | 1 |
| hasInstalledCapacity_MW | 1 |
| installedCapacityAfterRehabilitation | 1 |
| projectInstalledCapacity | 1 |
| totalOriginalInstalledCapacity | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: installedCapacity
Generated description
Indicates the maximum output or production capability that has been set up or built for a system, facility, or equipment, typically measured under specified conditions.
Sample triples (337)
| Subject | Object |
|---|---|
| Hoover Dam | about 2,080 MW ⓘ |
| Jurala Dam | 234 MW ⓘ |
| Ormonde Offshore Wind Farm | 150 MW via predicate surface "nameplateCapacity" ⓘ |
| Nagarjuna Sagar Dam | hydroelectric power station of several hundred megawatts ⓘ |
| Indira Sagar Dam | 1000 MW ⓘ |
| Omkareshwar Dam | 520 MW ⓘ |
| Aswan High Dam | 2100 megawatts ⓘ |
| Shasta Dam | about 676 MW ⓘ |
| Gariep Dam | approximately 360 MW ⓘ |
| Bargi Dam | 90 MW ⓘ |
| New Melones Dam | about 300 megawatts ⓘ |
| Snowy Hydro Scheme | about 4100 MW ⓘ |
| Oroville Dam | approximately 819 megawatts ⓘ |
| Cahora Bassa Dam | about 2075 MW ⓘ |
| Itezhi-Tezhi Dam | 120 MW ⓘ |
| Sardar Sarovar Dam | 1450 via predicate surface "installedCapacity_MW" ⓘ |
| Tarbela Dam | over 4,800 megawatts ⓘ |
| The Dalles Dam | over 1,800 megawatts ⓘ |
| McNary Dam | 980 MW ⓘ |
| Chief Joseph Dam | 2620 MW ⓘ |
| Three Gorges Dam | 22500 MW ⓘ |
| Melton Hill Dam | approximately 79 MW ⓘ |
| Ranjit Sagar Dam | 600 MW ⓘ |
| Thein Dam | 600 MW ⓘ |
| Norris Dam | approximately 131 megawatts ⓘ |
| Calvert Cliffs Nuclear Power Plant | approximately 1735 MWe via predicate surface "designedNetCapacity" ⓘ |
| Keban Dam | 1,330 MW ⓘ |
| Atatürk Dam | 2400 MW ⓘ |
| Tabqa Dam | about 824 MW ⓘ |
| Gezhouba Dam | 2715 MW ⓘ |
| Yacyretá Dam | 3100 MW ⓘ |
| Kentucky Dam | approximately 223 MW ⓘ |
| Itaipu Dam | 14000 via predicate surface "installedCapacity_MW" ⓘ |
| Pong Dam | about 396 MW ⓘ |
| Pickwick Landing Dam | approximately 229 megawatts ⓘ |
| Karcham Wangtoo Dam | 1000 MW ⓘ |
| Nathpa Jhakri Dam | 1500 MW ⓘ |
| Serre-Ponçon Dam | 380 megawatts ⓘ |
| Florentino Ameghino Dam | 60 MW ⓘ |
| Ralco Dam | 690 MW ⓘ |
| Beauharnois generating station | 1903 MW ⓘ |
| Churchill Falls Generating Station | 5428 MW ⓘ |
| Colbún Dam | 400 MW ⓘ |
| Kishanganga Hydroelectric Plant | 330 MW ⓘ |
| Carillon generating station | 752 MW ⓘ |
| Pangue Dam | 467 MW ⓘ |
| Riga Hydroelectric Power Plant | 402 MW ⓘ |
| Angostura Dam | 316 MW ⓘ |
| Plavinas Hydroelectric Power Plant | 894 MW ⓘ |
| Jebba Dam | 578 MW ⓘ |