turbineCapacity
P30472
predicate
Indicates the power-generating capacity or rated output of a turbine.
Aliases (3)
- electricalCapacity ×6
- turbineCapacity_MW ×1
- turbineRatedPower ×1
Sample triples (17)
| Subject | Object |
|---|---|
| Atatürk Dam | 300 MW → |
| Bargi Dam | 30 MW → |
| Barrow Offshore Wind Farm | 3 MW → |
| Barrow Offshore Wind Farm | 90 MW ("electricalCapacity") → |
| Gwynt y Môr Wind Farm | 576 MW ("electricalCapacity") → |
| Gwynt y Môr Wind Farm | 576 megawatts ("electricalCapacity") → |
| Indira Sagar Dam | 125 MW → |
| Itaipu Dam | 700 ("turbineCapacity_MW") → |
| Jurala Dam | 39 MW → |
| North Hoyle Offshore Wind Farm | 2 MW → |
| North Hoyle Offshore Wind Farm | 60 MW ("electricalCapacity") → |
| Ormonde Offshore Wind Farm | 150 MW ("electricalCapacity") → |
| Ormonde Offshore Wind Farm | 5 MW ("turbineRatedPower") → |
| Ranjit Sagar Dam | 150 MW → |
| Robin Rigg Offshore Wind Farm | 180 MW ("electricalCapacity") → |
| Thein Dam | 150 MW → |
| Three Gorges Dam | 700 MW → |