Uri I Power Station
E533683
Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
All labels observed (2)
| Label | Occurrences |
|---|---|
| Uri I Power Station canonical | 1 |
| Uri II Power Station | 1 |
How this entity was disambiguated
This entity first appeared as the object of triple T5601133 — resolving that mention is where its identity was fixed. The disambiguator weighed these candidate entities and picked the highlighted one (or “None”, minting a new entity). This is how homonymy is resolved: the same surface form can point to different entities.
Target entity: Uri I Power Station Context triple: [Uri Dam, hasPart, Uri I Power Station]
-
A.
Olidan power station
Olidan power station is one of Sweden’s oldest large-scale hydroelectric power plants, located in Trollhättan and historically important for the country’s industrial electrification.
-
B.
Vamma power station
Vamma power station is a major hydroelectric power plant in Norway, harnessing the flow of the Glomma River to generate renewable energy.
-
C.
Atiamuri Power Station
Atiamuri Power Station is a hydroelectric power station in New Zealand that generates electricity from the flow of the Waikato River.
-
D.
Guthega Power Station
Guthega Power Station is a hydroelectric power plant in New South Wales, Australia, forming part of the large-scale Snowy Mountains Hydroelectric Scheme.
-
E.
Ptolemaida Power Station
Ptolemaida Power Station is a major lignite-fired thermal power plant in northern Greece that has long been one of the country’s key electricity-generating facilities.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Target entity: Uri I Power Station Target entity description: Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
-
A.
Olidan power station
Olidan power station is one of Sweden’s oldest large-scale hydroelectric power plants, located in Trollhättan and historically important for the country’s industrial electrification.
-
B.
Vamma power station
Vamma power station is a major hydroelectric power plant in Norway, harnessing the flow of the Glomma River to generate renewable energy.
-
C.
Atiamuri Power Station
Atiamuri Power Station is a hydroelectric power station in New Zealand that generates electricity from the flow of the Waikato River.
-
D.
Guthega Power Station
Guthega Power Station is a hydroelectric power plant in New South Wales, Australia, forming part of the large-scale Snowy Mountains Hydroelectric Scheme.
-
E.
Ptolemaida Power Station
Ptolemaida Power Station is a major lignite-fired thermal power plant in northern Greece that has long been one of the country’s key electricity-generating facilities.
- F. None of above. chosen
Statements (36)
| Predicate | Object |
|---|---|
| instanceOf | hydroelectric power station ⓘ |
| basin | Indus River basin NERFINISHED ⓘ |
| basinCountry | India ⓘ |
| commissioned | 1997 ⓘ |
| constructionStartDate | 1989 ⓘ |
| country | India ⓘ |
| designedBy | NHPC Limited NERFINISHED ⓘ |
| distanceFromSrinagar | about 100 km ⓘ |
| fundedBy | Government of India NERFINISHED ⓘ |
| generationType | run-of-the-river ⓘ |
| gridConnection | Northern Regional Grid of India NERFINISHED ⓘ |
| hasExtension | Uri II Power Station NERFINISHED ⓘ |
| hasPart | Uri Dam NERFINISHED ⓘ |
| impact | regional power supply in Jammu and Kashmir ⓘ |
| installedCapacity | 480 MW ⓘ |
| locatedIn |
Baramulla district
NERFINISHED
ⓘ
Jammu and Kashmir NERFINISHED ⓘ Kashmir Valley NERFINISHED ⓘ |
| locatedNear | Uri NERFINISHED ⓘ |
| managingOrganization | Ministry of Power, Government of India NERFINISHED ⓘ |
| nearBorderWith | Pakistan-administered Kashmir NERFINISHED ⓘ |
| numberOfTurbines | 4 ⓘ |
| operator | NHPC Limited NERFINISHED ⓘ |
| ownedBy |
NHPC Limited
NERFINISHED
ⓘ
National Hydroelectric Power Corporation NERFINISHED ⓘ |
| penstockType | pressure tunnel ⓘ |
| primaryFuel | hydropower ⓘ |
| purpose | electricity generation ⓘ |
| regulatoryFramework | Indus Waters Treaty NERFINISHED ⓘ |
| river | Jhelum River NERFINISHED ⓘ |
| status | operational ⓘ |
| technology | underground powerhouse ⓘ |
| turbineCapacity | 120 MW ⓘ |
| turbineType | Francis turbine ⓘ |
| usesWaterFrom | Jhelum River NERFINISHED ⓘ |
| waterSourceCountry | India NERFINISHED ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Subject: Uri I Power Station Description of subject: Uri I Power Station is a major hydroelectric power facility in Jammu and Kashmir, India, utilizing water from the Jhelum River to generate electricity.
Referenced by (2)
Full triples — surface form annotated when it differs from this entity's canonical label.