turbineCapacity
P30472
predicate
Indicates the power-generating capacity or rated output of a turbine.
All labels observed (13)
| Label | Occurrences |
|---|---|
| turbineCapacity canonical | 34 |
| electricalCapacity | 30 |
| capacityPerTurbine | 6 |
| singleTurbineCapacity | 5 |
| individualTurbineCapacity | 2 |
| turbineCapacityMW | 2 |
| turbineCapacity_MW | 2 |
| hasTurbineCapacity | 1 |
| originalCapacityPerUnit_MW | 1 |
| originalTurbineCapacity | 1 |
| plantTurbineCapacity | 1 |
| turbineRatedCapacity | 1 |
| turbineRatedPower | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: turbineCapacity
Generated description
Indicates the power-generating capacity or rated output of a turbine.
Sample triples (87)
| Subject | Object |
|---|---|
| Brayton Point Power Station | approximately 1500 MW via predicate surface "electricalCapacity" ⓘ |
| Brayton Point Power Station | over 1500 megawatts at peak via predicate surface "electricalCapacity" ⓘ |
| Nurek Dam | 335 megawatts ⓘ |
| Sangtuda 1 Dam | 167.5 MW ⓘ |
| Rogun Dam | 600 MW via predicate surface "singleTurbineCapacity" ⓘ |
| La Yesca Dam | 375 MW ⓘ |
| Chirkey Dam | 250 MW ⓘ |
| Annapolis Royal Generating Station | 20 megawatts via predicate surface "electricalCapacity" ⓘ |
| Nachtigal Hydropower Project | 60 MW ⓘ |
| Kriel Power Station | 3000 megawatts via predicate surface "electricalCapacity" ⓘ |
| Horns Rev 2 | 2.3 MW via predicate surface "singleTurbineCapacity" ⓘ |
| Horns Rev 2 | 209 MW via predicate surface "electricalCapacity" ⓘ |
| Gunfleet Sands Offshore Wind Farm | 172 MW via predicate surface "electricalCapacity" ⓘ |
| Gunfleet Sands Offshore Wind Farm | approximately 172 megawatts via predicate surface "electricalCapacity" ⓘ |
| Greater Gabbard Offshore Wind Farm | 504 MW via predicate surface "electricalCapacity" ⓘ |
| Baihetan Dam | 1000 MW ⓘ |
| Geheyan Dam | 300 MW via predicate surface "plantTurbineCapacity" ⓘ |
|
Hidroituango (on the Cauca River in Antioquia)
surface form:
Hidroituango
|
300 via predicate surface "turbineCapacity_MW" ⓘ |
|
Arklow Bank Wind Park
surface form:
Arklow Bank Wind Park Phase 1
|
3.6 via predicate surface "turbineCapacityMW" ⓘ |
| Trị An Dam | 100 MW ⓘ |
| West of Duddon Sands Offshore Wind Farm | 389 MW via predicate surface "electricalCapacity" ⓘ |
| Gwynt y Môr | 3.6 MW ⓘ |
| Karun-3 Dam | 250 MW ⓘ |
| Burbo Bank Offshore Wind Farm | 3.6 via predicate surface "turbineCapacityMW" ⓘ |
| Karun-4 Dam | 250 MW ⓘ |
| Kentish Flats Offshore Wind Farm | 3 MW via predicate surface "turbineRatedCapacity" ⓘ |
|
Cattenom
surface form:
Cattenom Nuclear Power Plant
|
5200 MW (approximate) via predicate surface "electricalCapacity" ⓘ |
|
Horns Rev offshore wind projects
surface form:
Horns Rev 1
|
2 MW ⓘ |
|
Horns Rev offshore wind projects
surface form:
Horns Rev 2
|
2.3 MW ⓘ |
|
Horns Rev offshore wind projects
surface form:
Horns Rev 3
|
8.3 MW ⓘ |
| Xingó Dam | 500 MW via predicate surface "capacityPerTurbine" ⓘ |
| Tilaiya Dam | 2 megawatts ⓘ |
| Ertan Dam | 550 MW via predicate surface "capacityPerTurbine" ⓘ |
| Shuangjiangkou Dam | 500 MW via predicate surface "singleTurbineCapacity" ⓘ |
| Dagangshan Dam | 650 MW ⓘ |
| Playford B Power Station | 240 MW via predicate surface "electricalCapacity" ⓘ |
| Ust-Ilimsk Dam | 3840 megawatt via predicate surface "electricalCapacity" ⓘ |