Triple
T15658917
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Supreme Court reversed the D.C. Circuit |
E376518
|
entity |
| Predicate | isOutcomeOf |
P59870
|
FINISHED |
| Object | Vermont Yankee Nuclear Power Corp. v. NRDC decision |
E77393
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vermont Yankee Nuclear Power Corp. v. NRDC decision | Statement: [Supreme Court reversed the D.C. Circuit, isOutcomeOf, Vermont Yankee Nuclear Power Corp. v. NRDC decision]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Vermont Yankee Nuclear Power Corp. v. NRDC decision Context triple: [Supreme Court reversed the D.C. Circuit, isOutcomeOf, Vermont Yankee Nuclear Power Corp. v. NRDC decision]
-
A.
Vermont Yankee Nuclear Power Corp. v. NRDC
chosen
Vermont Yankee Nuclear Power Corp. v. NRDC is a 1978 U.S. Supreme Court case that limited courts’ ability to impose additional procedural requirements on federal agencies beyond those mandated by the Administrative Procedure Act and relevant statutes.
-
B.
Calvert Cliffs Coordinating Committee v. U.S. Atomic Energy Commission
Calvert Cliffs Coordinating Committee v. U.S. Atomic Energy Commission is a landmark 1971 federal court decision that gave strong judicial force to the National Environmental Policy Act by requiring agencies to rigorously consider environmental impacts in their decision-making.
-
C.
D.C. Circuit in NRDC v. NRC
D.C. Circuit in NRDC v. NRC is a federal appellate court decision by the U.S. Court of Appeals for the District of Columbia Circuit in an environmental regulatory case involving the Natural Resources Defense Council and the Nuclear Regulatory Commission.
-
D.
Alden v. Maine
Alden v. Maine is a 1999 U.S. Supreme Court decision that expanded state sovereign immunity by holding that states are generally immune from private suits for damages in their own courts under federal law.
-
E.
Kelo v. City of New London
Kelo v. City of New London is a landmark 2005 U.S. Supreme Court case that expanded the interpretation of “public use” under the Takings Clause to allow government seizure of private property for economic development projects.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: isOutcomeOf Context triple: [Supreme Court reversed the D.C. Circuit, isOutcomeOf, Vermont Yankee Nuclear Power Corp. v. NRDC decision]
-
A.
outcomeOf
chosen
Indicates that one entity is the result, consequence, or product that arises from another entity, event, or process.
-
B.
describesOutcomeOf
Indicates that one entity specifies or characterizes the result, consequence, or outcome produced by another entity or process.
-
C.
associatedWithOutcome
Indicates a relationship where an entity is linked to, contributes to, or results in a particular outcome.
-
D.
outcomeType
Indicates the specific category or nature of the result produced by an event, process, or action.
-
E.
initialOutcome
Indicates the result or state that first occurs at the beginning of a process, event, or interaction, before any subsequent changes or outcomes.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd1564c8190991adda63bfab4b0 |
completed | April 10, 2026, 2:13 a.m. |
| NER | Named-entity recognition | batch_69e04ef3cb8c8190a10815b675b341c1 |
completed | April 16, 2026, 2:52 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ff875e49748190a2a4aceb649762b4 |
completed | May 9, 2026, 7:13 p.m. |
| PD | Predicate disambiguation | batch_69deda890140819082608931e993dd61 |
completed | April 15, 2026, 12:23 a.m. |
Created at: April 10, 2026, 4:15 a.m.