Triple

T15658917
Position Surface form Disambiguated ID Type / Status
Subject Supreme Court reversed the D.C. Circuit E376518 entity
Predicate isOutcomeOf P59870 FINISHED
Object Vermont Yankee Nuclear Power Corp. v. NRDC decision E77393 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Vermont Yankee Nuclear Power Corp. v. NRDC decision | Statement: [Supreme Court reversed the D.C. Circuit, isOutcomeOf, Vermont Yankee Nuclear Power Corp. v. NRDC decision]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Vermont Yankee Nuclear Power Corp. v. NRDC decision
Context triple: [Supreme Court reversed the D.C. Circuit, isOutcomeOf, Vermont Yankee Nuclear Power Corp. v. NRDC decision]
  • A. Vermont Yankee Nuclear Power Corp. v. NRDC chosen
    Vermont Yankee Nuclear Power Corp. v. NRDC is a 1978 U.S. Supreme Court case that limited courts’ ability to impose additional procedural requirements on federal agencies beyond those mandated by the Administrative Procedure Act and relevant statutes.
  • B. Calvert Cliffs Coordinating Committee v. U.S. Atomic Energy Commission
    Calvert Cliffs Coordinating Committee v. U.S. Atomic Energy Commission is a landmark 1971 federal court decision that gave strong judicial force to the National Environmental Policy Act by requiring agencies to rigorously consider environmental impacts in their decision-making.
  • C. D.C. Circuit in NRDC v. NRC
    D.C. Circuit in NRDC v. NRC is a federal appellate court decision by the U.S. Court of Appeals for the District of Columbia Circuit in an environmental regulatory case involving the Natural Resources Defense Council and the Nuclear Regulatory Commission.
  • D. Alden v. Maine
    Alden v. Maine is a 1999 U.S. Supreme Court decision that expanded state sovereign immunity by holding that states are generally immune from private suits for damages in their own courts under federal law.
  • E. Kelo v. City of New London
    Kelo v. City of New London is a landmark 2005 U.S. Supreme Court case that expanded the interpretation of “public use” under the Takings Clause to allow government seizure of private property for economic development projects.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isOutcomeOf
Context triple: [Supreme Court reversed the D.C. Circuit, isOutcomeOf, Vermont Yankee Nuclear Power Corp. v. NRDC decision]
  • A. outcomeOf chosen
    Indicates that one entity is the result, consequence, or product that arises from another entity, event, or process.
  • B. describesOutcomeOf
    Indicates that one entity specifies or characterizes the result, consequence, or outcome produced by another entity or process.
  • C. associatedWithOutcome
    Indicates a relationship where an entity is linked to, contributes to, or results in a particular outcome.
  • D. outcomeType
    Indicates the specific category or nature of the result produced by an event, process, or action.
  • E. initialOutcome
    Indicates the result or state that first occurs at the beginning of a process, event, or interaction, before any subsequent changes or outcomes.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd1564c8190991adda63bfab4b0 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69e04ef3cb8c8190a10815b675b341c1 completed April 16, 2026, 2:52 a.m.
NED1 Entity disambiguation (via context triple) batch_69ff875e49748190a2a4aceb649762b4 completed May 9, 2026, 7:13 p.m.
PD Predicate disambiguation batch_69deda890140819082608931e993dd61 completed April 15, 2026, 12:23 a.m.
Created at: April 10, 2026, 4:15 a.m.