All labels observed (26)
| Label | Occurrences |
|---|---|
| plantCapacity | 35 |
| netElectricalCapacity_MWe canonical | 32 |
| netElectricalCapacity | 15 |
| powerPlantCapacity | 13 |
| electricalCapacity_MWe_net | 4 |
| netCapacity_MWe | 4 |
| totalNetCapacity_MWe | 4 |
| hasElectricalCapacity | 3 |
| hasMaximumGeneratingCapacity | 3 |
| reactorNetCapacity_MWe | 3 |
| unit1NetCapacity_MWe | 3 |
| totalNetElectricalCapacity | 2 |
| unit2NetCapacity_MWe | 2 |
| generatorCapacity | 1 |
| installedCapacity_MWe_net | 1 |
| netElectricalCapacityPerUnit_MWe | 1 |
| netElectricalCapacity_MW | 1 |
| netElectricalOutput | 1 |
| reactor1NetCapacity_MWe | 1 |
| reactor2NetCapacity_MWe | 1 |
| reactor3NetCapacity_MWe | 1 |
| reactor4NetCapacity_MWe | 1 |
| reactor5NetCapacity_MWe | 1 |
| reactor6NetCapacity_MWe | 1 |
| reactorElectricalCapacity_MWe | 1 |
| totalNetElectricalCapacity_MWe | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: netElectricalCapacity_MWe
Generated description
Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
Sample triples (136)
| Subject | Object |
|---|---|
| Fukushima Daiichi Unit 1 | 460 ⓘ |
| Philippsburg Nuclear Power Plant | 926 MW via predicate surface "netElectricalCapacity" ⓘ |
| Philippsburg Nuclear Power Plant | 1468 MW via predicate surface "netElectricalCapacity" ⓘ |
| Karkheh Dam | 400 MW via predicate surface "plantCapacity" ⓘ |
| Hope Creek Unit 1 | approximately 1172 ⓘ |
| Salem Unit 1 | ~1150 ⓘ |
| Salem Unit 2 | 1118 via predicate surface "electricalCapacity_MWe_net" ⓘ |
| J. Percy Priest Dam | about 28 megawatts via predicate surface "powerPlantCapacity" ⓘ |
| Paks Nuclear Power Plant | about 2000 MWe via predicate surface "netElectricalCapacity" ⓘ |
| Maithon Dam | about 60 MW via predicate surface "powerPlantCapacity" ⓘ |
| Salt Springs Dam | about 44 megawatts via predicate surface "plantCapacity" ⓘ |
| Bushehr Nuclear Power Plant | 915 ⓘ |
|
Indian Point Energy Center
surface form:
Indian Point Unit 1
|
275 via predicate surface "netCapacity_MWe" ⓘ |
|
Indian Point Energy Center
surface form:
Indian Point Unit 2
|
about 1020 via predicate surface "netCapacity_MWe" ⓘ |
|
Indian Point Energy Center
surface form:
Indian Point Unit 3
|
about 1040 via predicate surface "netCapacity_MWe" ⓘ |
|
Tihange nuclear power station
surface form:
Tihange 1
|
962 MW via predicate surface "netElectricalCapacity" ⓘ |
|
Tihange nuclear power station
surface form:
Tihange 2
|
1008 MW via predicate surface "netElectricalCapacity" ⓘ |
|
Tihange nuclear power station
surface form:
Tihange 3
|
1015 MW via predicate surface "netElectricalCapacity" ⓘ |
| Pardee Dam | 30000 kilowatts via predicate surface "powerPlantCapacity" ⓘ |
| Wolf Creek Dam | 270 megawatts via predicate surface "plantCapacity" ⓘ |
| Tuirial Hydroelectric Project | 60 MW via predicate surface "plantCapacity" ⓘ |
| Mettur Thermal Power Station | 840 MW via predicate surface "hasElectricalCapacity" ⓘ |
| Mettur Thermal Power Station | approximately 840 megawatts via predicate surface "hasElectricalCapacity" ⓘ |
| Blakely Mountain Dam | 75 MW via predicate surface "plantCapacity" ⓘ |
| Keepit Dam | 7.2 MW via predicate surface "plantCapacity" ⓘ |
| New Bullards Bar Dam | approximately 315 megawatts via predicate surface "powerPlantCapacity" ⓘ |
| Cordell Hull Dam | 100 MW via predicate surface "plantCapacity" ⓘ |
| Braidwood Nuclear Generating Station | about 2330 ⓘ |
|
Braidwood Nuclear Generating Station
surface form:
Braidwood-1
|
about 1160 ⓘ |
|
Braidwood Nuclear Generating Station
surface form:
Braidwood-2
|
about 1170 ⓘ |
| Shepaug Dam | approximately 42 megawatts via predicate surface "plantCapacity" ⓘ |
| Cernavodă Nuclear Power Plant | 700 via predicate surface "unit1NetCapacity_MWe" ⓘ |
| Cernavodă Nuclear Power Plant | 700 via predicate surface "unit2NetCapacity_MWe" ⓘ |
| Cernavodă Nuclear Power Plant | 1400 via predicate surface "totalNetCapacity_MWe" ⓘ |
| Comanche Peak Unit 1 | about 1150 ⓘ |
| Comanche Peak Unit 2 | 1150 ⓘ |