Tuirial Hydroelectric Project
E1014921
Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
All labels observed (1)
| Label | Occurrences |
|---|---|
| Tuirial Hydroelectric Project canonical | 1 |
Statements (33)
| Predicate | Object |
|---|---|
| instanceOf |
hydroelectric power station
ⓘ
run-of-the-river power project ⓘ |
| abbreviation | Tuirial HEP NERFINISHED ⓘ |
| beneficiaryState |
Mizoram
NERFINISHED
ⓘ
other North Eastern states of India ⓘ |
| category | Hydroelectric power stations in Mizoram ⓘ |
| country | India ⓘ |
| countrySubdivision | state of Mizoram NERFINISHED ⓘ |
| developer | North Eastern Electric Power Corporation Limited NERFINISHED ⓘ |
| energySource | hydropower ⓘ |
| fundingAgency |
Government of India
NERFINISHED
ⓘ
Government of Mizoram NERFINISHED ⓘ |
| gridConnection | North Eastern Regional Grid NERFINISHED ⓘ |
| inauguratedBy |
Narendra Modi
NERFINISHED
ⓘ
Prime Minister of India ⓘ |
| inception | December 2017 ⓘ |
| installedOn | Tuirial River NERFINISHED ⓘ |
| locatedIn |
Aizawl district
NERFINISHED
ⓘ
Mizoram NERFINISHED ⓘ northeastern India ⓘ |
| locatedNear | Aizawl NERFINISHED ⓘ |
| numberOfUnits | 2 ⓘ |
| owner | North Eastern Electric Power Corporation Limited NERFINISHED ⓘ |
| plantCapacity | 60 MW ⓘ |
| purpose | electricity generation ⓘ |
| regionServed |
Mizoram
NERFINISHED
ⓘ
North Eastern Region of India NERFINISHED ⓘ |
| river | Tuirial River NERFINISHED ⓘ |
| sector | power sector ⓘ |
| status | operational ⓘ |
| typeOfDam | concrete gravity dam ⓘ |
| unitCapacity | 30 MW ⓘ |
| watercourse | Tuirial River NERFINISHED ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
Instruction
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Input
Subject: Tuirial Hydroelectric Project Description of subject: Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
Referenced by (1)
Full triples — surface form annotated when it differs from this entity's canonical label.