Triple

T13023377
Position Surface form Disambiguated ID Type / Status
Subject Tuirial River E326233 entity
Predicate hasHydropowerProject P15311 FINISHED
Object Tuirial Hydroelectric Project
Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
E1014921 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tuirial Hydroelectric Project | Statement: [Tuirial River, hasHydropowerProject, Tuirial Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tuirial Hydroelectric Project
Context triple: [Tuirial River, hasHydropowerProject, Tuirial Hydroelectric Project]
  • A. Bassi Hydroelectric Project
    Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • B. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • C. Uri Hydroelectric Project
    The Uri Hydroelectric Project is a major run-of-the-river power generation scheme on the Jhelum River in Jammu and Kashmir, India, developed to harness hydroelectric energy in the Himalayan region.
  • D. Kopili Hydroelectric Project
    Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
  • E. Baspa II Hydroelectric Project
    Baspa II Hydroelectric Project is a run-of-the-river hydroelectric power plant in Himachal Pradesh, India, that harnesses the Baspa River to generate electricity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Tuirial Hydroelectric Project
Triple: [Tuirial River, hasHydropowerProject, Tuirial Hydroelectric Project]
Generated description
Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Tuirial Hydroelectric Project
Target entity description: Tuirial Hydroelectric Project is a hydroelectric power station in Mizoram, India, built on the Tuirial River to generate electricity for the region.
  • A. Bassi Hydroelectric Project
    Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
  • B. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • C. Uri Hydroelectric Project
    The Uri Hydroelectric Project is a major run-of-the-river power generation scheme on the Jhelum River in Jammu and Kashmir, India, developed to harness hydroelectric energy in the Himalayan region.
  • D. Kopili Hydroelectric Project
    Kopili Hydroelectric Project is a major hydroelectric power station in Assam, India, built on the Kopili River to generate electricity for the northeastern region of the country.
  • E. Baspa II Hydroelectric Project
    Baspa II Hydroelectric Project is a run-of-the-river hydroelectric power plant in Himachal Pradesh, India, that harnesses the Baspa River to generate electricity.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076cc45c81908123123f43e69266 completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69d97ed05e9c8190a4f208662bca0602 completed April 10, 2026, 10:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69f6c11c1f6c8190be1c570a7e44a313 completed May 3, 2026, 3:29 a.m.
NEDg Description generation batch_69f6c20aff008190a1a10ac02ed08726 completed May 3, 2026, 3:33 a.m.
NED2 Entity disambiguation (via description) batch_69f6c2de143c81908164f5df2b92e5c3 completed May 3, 2026, 3:37 a.m.
Created at: April 9, 2026, 8:52 p.m.