hydroelectricStationCapacity
P29533
predicate
Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
All labels observed (6)
| Label | Occurrences |
|---|---|
| hydropowerProjectCapacity | 3 |
| hydroelectricPlantCapacity | 2 |
| associatedHydropowerPlantCapacity | 1 |
| hasHydroCapacityApprox | 1 |
| hydroelectricStationCapacity canonical | 1 |
| hydropowerPlantCapacity | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: hydroelectricStationCapacity
Generated description
Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
Sample triples (9)
| Subject | Object |
|---|---|
| Churchill Falls | approximately 5400 MW ⓘ |
| Eigg Electric | 100 kW via predicate surface "hasHydroCapacityApprox" ⓘ |
| Bujagali Falls | approximately 250 MW via predicate surface "associatedHydropowerPlantCapacity" ⓘ |
| Wivenhoe Dam | 500 MW via predicate surface "hydroelectricPlantCapacity" ⓘ |
| Kuri Chhu | 60 MW via predicate surface "hydropowerPlantCapacity" ⓘ |
| Nathpa | 1500 MW (Nathpa Jhakri Hydroelectric Project, shared with Jhakri) via predicate surface "hydropowerProjectCapacity" ⓘ |
| Kabeli Khola | Kabeli-A Hydroelectric Project 37.6 MW via predicate surface "hydropowerProjectCapacity" ⓘ |
| Budhi Gandaki River | 1200 MW (planned) via predicate surface "hydropowerProjectCapacity" ⓘ |
| Beauharnois | over 1900 MW via predicate surface "hydroelectricPlantCapacity" ⓘ |