Triple
T12755077
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bujagali Falls |
E304836
|
entity |
| Predicate | associatedHydropowerPlantCapacity |
P29533
|
FINISHED |
| Object | approximately 250 MW |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: approximately 250 MW | Statement: [Bujagali Falls, associatedHydropowerPlantCapacity, approximately 250 MW]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: associatedHydropowerPlantCapacity Context triple: [Bujagali Falls, associatedHydropowerPlantCapacity, approximately 250 MW]
-
A.
hydroelectricStationCapacity
chosen
Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
-
B.
hydropowerPlantCountry
Indicates that a hydropower plant is located in, or belongs to, a specific country.
-
C.
hydropowerPotential
Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
-
D.
totalElectricalCapacity_MWe
Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
-
E.
hasHydroelectricProject
Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d7bdf1fcd081909ffb0e0d6fa3a07d |
completed | April 9, 2026, 2:55 p.m. |
| NER | Named-entity recognition | batch_69d96d89ea70819098c470344f172167 |
completed | April 10, 2026, 9:37 p.m. |
| PD | Predicate disambiguation | batch_69d96406e97c8190b79081039847115c |
completed | April 10, 2026, 8:56 p.m. |
Created at: April 9, 2026, 5:27 p.m.