Triple

T19676801
Position Surface form Disambiguated ID Type / Status
Subject Nathpa E472472 entity
Predicate hydropowerProjectCapacity P29533 FINISHED
Object 1500 MW (Nathpa Jhakri Hydroelectric Project, shared with Jhakri) LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1500 MW (Nathpa Jhakri Hydroelectric Project, shared with Jhakri) | Statement: [Nathpa, hydropowerProjectCapacity, 1500 MW (Nathpa Jhakri Hydroelectric Project, shared with Jhakri)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hydropowerProjectCapacity
Context triple: [Nathpa, hydropowerProjectCapacity, 1500 MW (Nathpa Jhakri Hydroelectric Project, shared with Jhakri)]
  • A. hydroelectricStationCapacity chosen
    Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
  • B. rankAmongWorldHydroelectricPlantsByCapacity
    Indicates the position of a hydroelectric plant in a global ranking ordered by its electricity generation capacity.
  • C. hydropowerPotential
    Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
  • D. hasHydroelectricProject
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • E. totalElectricalCapacity_MWe
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e514f2e08190ba70a4449519d218 completed April 10, 2026, 11:55 a.m.
NER Named-entity recognition batch_69e641bbea8c8190b0ad841d95068e0e completed April 20, 2026, 3:09 p.m.
PD Predicate disambiguation batch_69e514eb37b8819091502cc954f70eba completed April 19, 2026, 5:46 p.m.
Created at: April 10, 2026, 1:45 p.m.