Triple
T19676801
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nathpa |
E472472
|
entity |
| Predicate | hydropowerProjectCapacity |
P29533
|
FINISHED |
| Object | 1500 MW (Nathpa Jhakri Hydroelectric Project, shared with Jhakri) |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1500 MW (Nathpa Jhakri Hydroelectric Project, shared with Jhakri) | Statement: [Nathpa, hydropowerProjectCapacity, 1500 MW (Nathpa Jhakri Hydroelectric Project, shared with Jhakri)]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hydropowerProjectCapacity Context triple: [Nathpa, hydropowerProjectCapacity, 1500 MW (Nathpa Jhakri Hydroelectric Project, shared with Jhakri)]
-
A.
hydroelectricStationCapacity
chosen
Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
-
B.
rankAmongWorldHydroelectricPlantsByCapacity
Indicates the position of a hydroelectric plant in a global ranking ordered by its electricity generation capacity.
-
C.
hydropowerPotential
Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
-
D.
hasHydroelectricProject
Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
-
E.
totalElectricalCapacity_MWe
Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8e514f2e08190ba70a4449519d218 |
completed | April 10, 2026, 11:55 a.m. |
| NER | Named-entity recognition | batch_69e641bbea8c8190b0ad841d95068e0e |
completed | April 20, 2026, 3:09 p.m. |
| PD | Predicate disambiguation | batch_69e514eb37b8819091502cc954f70eba |
completed | April 19, 2026, 5:46 p.m. |
Created at: April 10, 2026, 1:45 p.m.