numberOfTurbines
P11310
predicate
Indicates the quantity of turbines associated with a given entity or installation.
All labels observed (11)
| Label | Occurrences |
|---|---|
| numberOfTurbines canonical | 303 |
| hasNumberOfTurbines | 8 |
| turbineCount | 6 |
| numberOfWindTurbines | 2 |
| plantTurbines | 2 |
| hasNumberOfTurbineGenerators | 1 |
| hasTurbineCount | 1 |
| hasWindTurbinesCount | 1 |
| originalTurbinesInstalled | 1 |
| plantTurbineCount | 1 |
| windTurbineCount | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: numberOfTurbines
Generated description
Indicates the quantity of turbines associated with a given entity or installation.
Sample triples (327)
| Subject | Object |
|---|---|
| Shuangjiangkou Dam | 4 ⓘ |
| Tonstad Hydropower Station | 5 ⓘ |
| Dagangshan Dam | 4 ⓘ |
| Tavera Dam | 3 ⓘ |
| Vidraru Dam | 4 ⓘ |
| Wolf Creek Dam | 6 ⓘ |
| Novosibirsk Hydroelectric Power Plant | 7 ⓘ |
| Irkutsk Dam | 4 ⓘ |
| Cheboksary Hydroelectric Station | 18 ⓘ |
| Ust-Ilimsk Dam | 16 ⓘ |
| Boguchany Dam | 9 ⓘ |
| Keepit Dam | 2 ⓘ |
| Lamma Winds wind turbine | 1 ⓘ |
| Hirfanlı Dam | 4 ⓘ |
| Kindaruma Dam | 3 ⓘ |
| Brilliant Dam | 4 ⓘ |
| Teesta Stage III Hydroelectric Project | 6 ⓘ |
| Cordell Hull Dam | 3 ⓘ |
| Shepaug Dam | 2 ⓘ |
| Kiira Power Station | 5 via predicate surface "hasTurbineCount" ⓘ |
| Owen Falls Dam | 10 ⓘ |
| Volgograd Hydroelectric Station | 22 ⓘ |
| Votkinsk Hydroelectric Station | 10 ⓘ |
| Bratsk Dam | 18 ⓘ |
| Nyabarongo I Hydropower Plant | 3 ⓘ |
| Teesta V Dam | 3 ⓘ |
| Jordan Dam | 4 ⓘ |