Teesta Stage III Hydroelectric Project
E1047579
Teesta Stage III Hydroelectric Project is a major run-of-the-river hydropower plant on the Teesta River in Sikkim, India, designed to generate electricity for the regional grid.
Statements (45)
| Predicate | Object |
|---|---|
| instanceOf |
hydroelectric power plant
ⓘ
run-of-the-river power plant ⓘ |
| basin | Teesta River basin NERFINISHED ⓘ |
| category | large hydro project in India ⓘ |
| commissioned | 2017 ⓘ |
| connectedTo | Indian national power grid ⓘ |
| constructionStart | 2009 ⓘ |
| country | India ⓘ |
| damType | concrete gravity dam ⓘ |
| designType | run-of-the-river scheme ⓘ |
| downstreamProject | Teesta Stage V Hydroelectric Project NERFINISHED ⓘ |
| energySource |
hydropower
ⓘ
renewable energy ⓘ |
| environmentalImpact |
alteration of Teesta River flow regime
ⓘ
submergence of local land ⓘ |
| financingType | public–private partnership ⓘ |
| fuelType | water ⓘ |
| gridConnection | regional grid of India ⓘ |
| headworksLocation | Chungthang NERFINISHED ⓘ |
| installedCapacity | 1200 MW ⓘ |
| locatedIn | Sikkim NERFINISHED ⓘ |
| locatedInDistrict | Chungthang area NERFINISHED ⓘ |
| locatedOnRiver | Teesta River NERFINISHED ⓘ |
| numberOfTurbines | 6 ⓘ |
| operator | Teesta Urja Limited NERFINISHED ⓘ |
| owner | Teesta Urja Limited NERFINISHED ⓘ |
| partOfCascade | Teesta River hydropower cascade NERFINISHED ⓘ |
| plantType | underground power house ⓘ |
| primaryBenefit | electricity supply to northeastern grid ⓘ |
| projectStageNumber | Stage III ⓘ |
| purpose | electricity generation ⓘ |
| regionServed | Northeastern India NERFINISHED ⓘ |
| regulatoryJurisdiction |
Central Electricity Authority of India
NERFINISHED
ⓘ
Central Electricity Regulatory Commission NERFINISHED ⓘ |
| riverSystem | Brahmaputra River system NERFINISHED ⓘ |
| secondaryBenefit | grid stability in the region ⓘ |
| sector | power sector of India ⓘ |
| socialImpact | displacement concerns for local communities ⓘ |
| state | Sikkim NERFINISHED ⓘ |
| stateGovernmentStakeholder | Government of Sikkim NERFINISHED ⓘ |
| stateRegulator | Sikkim State Electricity Regulatory Commission NERFINISHED ⓘ |
| status | operational ⓘ |
| technology | large hydroelectric generation ⓘ |
| turbineType | Francis turbine ⓘ |
| upstreamProject | Teesta Stage IV Hydroelectric Project NERFINISHED ⓘ |
Referenced by (1)