Teesta Stage III Hydroelectric Project
E1047579
Teesta Stage III Hydroelectric Project is a major run-of-the-river hydropower plant on the Teesta River in Sikkim, India, designed to generate electricity for the regional grid.
All labels observed (1)
| Label | Occurrences |
|---|---|
| Teesta Stage III Hydroelectric Project canonical | 1 |
How this entity was disambiguated
This entity first appeared as the object of triple T13533835 — resolving that mention is where its identity was fixed. The disambiguator weighed these candidate entities and picked the highlighted one (or “None”, minting a new entity). This is how homonymy is resolved: the same surface form can point to different entities.
Target entity: Teesta Stage III Hydroelectric Project Context triple: [Tista, hasHydropowerProject, Teesta Stage III Hydroelectric Project]
-
A.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
B.
Teesta hydropower cascade
Teesta hydropower cascade is a series of hydroelectric projects developed along the Teesta River to harness its flow for large-scale power generation.
-
C.
Arun III Hydroelectric Project
Arun III Hydroelectric Project is a major run-of-the-river hydropower plant under development in eastern Nepal, intended to generate electricity from the Arun River primarily for export to India and to support regional energy needs.
-
D.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
E.
Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Target entity: Teesta Stage III Hydroelectric Project Target entity description: Teesta Stage III Hydroelectric Project is a major run-of-the-river hydropower plant on the Teesta River in Sikkim, India, designed to generate electricity for the regional grid.
-
A.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
B.
Teesta hydropower cascade
Teesta hydropower cascade is a series of hydroelectric projects developed along the Teesta River to harness its flow for large-scale power generation.
-
C.
Arun III Hydroelectric Project
Arun III Hydroelectric Project is a major run-of-the-river hydropower plant under development in eastern Nepal, intended to generate electricity from the Arun River primarily for export to India and to support regional energy needs.
-
D.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
E.
Parbati Hydroelectric Project
The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
- F. None of above. chosen
Statements (45)
| Predicate | Object |
|---|---|
| instanceOf |
hydroelectric power plant
ⓘ
run-of-the-river power plant ⓘ |
| basin | Teesta River basin NERFINISHED ⓘ |
| category | large hydro project in India ⓘ |
| commissioned | 2017 ⓘ |
| connectedTo | Indian national power grid ⓘ |
| constructionStart | 2009 ⓘ |
| country | India ⓘ |
| damType | concrete gravity dam ⓘ |
| designType | run-of-the-river scheme ⓘ |
| downstreamProject | Teesta Stage V Hydroelectric Project NERFINISHED ⓘ |
| energySource |
hydropower
ⓘ
renewable energy ⓘ |
| environmentalImpact |
alteration of Teesta River flow regime
ⓘ
submergence of local land ⓘ |
| financingType | public–private partnership ⓘ |
| fuelType | water ⓘ |
| gridConnection | regional grid of India ⓘ |
| headworksLocation | Chungthang NERFINISHED ⓘ |
| installedCapacity | 1200 MW ⓘ |
| locatedIn | Sikkim NERFINISHED ⓘ |
| locatedInDistrict | Chungthang area NERFINISHED ⓘ |
| locatedOnRiver | Teesta River NERFINISHED ⓘ |
| numberOfTurbines | 6 ⓘ |
| operator | Teesta Urja Limited NERFINISHED ⓘ |
| owner | Teesta Urja Limited NERFINISHED ⓘ |
| partOfCascade | Teesta River hydropower cascade NERFINISHED ⓘ |
| plantType | underground power house ⓘ |
| primaryBenefit | electricity supply to northeastern grid ⓘ |
| projectStageNumber | Stage III ⓘ |
| purpose | electricity generation ⓘ |
| regionServed | Northeastern India NERFINISHED ⓘ |
| regulatoryJurisdiction |
Central Electricity Authority of India
NERFINISHED
ⓘ
Central Electricity Regulatory Commission NERFINISHED ⓘ |
| riverSystem | Brahmaputra River system NERFINISHED ⓘ |
| secondaryBenefit | grid stability in the region ⓘ |
| sector | power sector of India ⓘ |
| socialImpact | displacement concerns for local communities ⓘ |
| state | Sikkim NERFINISHED ⓘ |
| stateGovernmentStakeholder | Government of Sikkim NERFINISHED ⓘ |
| stateRegulator | Sikkim State Electricity Regulatory Commission NERFINISHED ⓘ |
| status | operational ⓘ |
| technology | large hydroelectric generation ⓘ |
| turbineType | Francis turbine ⓘ |
| upstreamProject | Teesta Stage IV Hydroelectric Project NERFINISHED ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Subject: Teesta Stage III Hydroelectric Project Description of subject: Teesta Stage III Hydroelectric Project is a major run-of-the-river hydropower plant on the Teesta River in Sikkim, India, designed to generate electricity for the regional grid.
Referenced by (1)
Full triples — surface form annotated when it differs from this entity's canonical label.