Triple
T36212117
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Teesta Stage III Hydroelectric Project |
E1047579
|
entity |
| Predicate | downstreamProject |
P5956
|
FINISHED |
| Object | Teesta Stage V Hydroelectric Project |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Teesta Stage V Hydroelectric Project | Statement: [Teesta Stage III Hydroelectric Project, downstreamProject, Teesta Stage V Hydroelectric Project]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: downstreamProject Context triple: [Teesta Stage III Hydroelectric Project, downstreamProject, Teesta Stage V Hydroelectric Project]
-
A.
downstreamProcess
Indicates that one process occurs later in a sequence and depends on the outputs or results of another, preceding process.
-
B.
downstreamProduct
Indicates that one entity is a product or outcome that results from, or is derived from, another entity in a downstream stage of a process or value chain.
-
C.
downstreamFrom
chosen
Indicates that one entity is located or occurs at a point further along the natural flow or direction of another entity, typically in a linear or directional system such as a river, pipeline, or process sequence.
-
D.
downstreamUse
Indicates that one entity makes use of the outputs, results, or products generated by another entity at a later stage in a process or workflow.
-
E.
parentProject
Indicates that one project serves as the direct higher-level or containing project in relation to another project.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e4214748190a76c986d2a1838c2 |
completed | May 3, 2026, 3:48 p.m. |
| NER | Named-entity recognition | batch_69f7b57b8c5081909ba41145ba7753d1 |
completed | May 3, 2026, 8:52 p.m. |
| PD | Predicate disambiguation | batch_69f7b4c44390819084fb5558b354658f |
completed | May 3, 2026, 8:49 p.m. |
Created at: May 3, 2026, 4:09 p.m.