Guangzhou Metro Line 11 (under construction)
E708876
Guangzhou Metro Line 11 (under construction) is a planned circular rapid transit line in Guangzhou designed to connect multiple central districts, including Tianhe, and enhance network capacity and interchange options across the city’s metro system.
All labels observed (1)
| Label | Occurrences |
|---|---|
| Guangzhou Metro Line 11 (under construction) canonical | 1 |
How this entity was disambiguated
This entity first appeared as the object of triple T8035471 — resolving that mention is where its identity was fixed. The disambiguator weighed these candidate entities and picked the highlighted one (or “None”, minting a new entity). This is how homonymy is resolved: the same surface form can point to different entities.
Target entity: Guangzhou Metro Line 11 (under construction) Context triple: [Tianhe District, hasRailTransport, Guangzhou Metro Line 11 (under construction)]
-
A.
Ho Chi Minh City Metro (under construction)
The Ho Chi Minh City Metro is a developing rapid transit system intended to provide modern urban rail service and alleviate traffic congestion in Vietnam’s largest city.
-
B.
Guangzhou Metro Line 7
Guangzhou Metro Line 7 is a rapid transit line in Guangzhou’s metro system that connects key southern districts and transport hubs, including Guangzhou South Railway Station.
-
C.
Guangzhou Metro Line 22
Guangzhou Metro Line 22 is a high-speed rapid transit line in Guangzhou designed to provide fast regional connections between major transport hubs and urban districts.
-
D.
Guangzhou Metro Line 5
Guangzhou Metro Line 5 is a major east–west rapid transit line in Guangzhou’s metro system, connecting key urban districts and serving as an important high-capacity commuter corridor.
-
E.
Shenzhen Metro Line 11
Shenzhen Metro Line 11 is a high-speed, express metro line in Shenzhen that connects the city center with key districts and Shenzhen Bao'an International Airport.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Target entity: Guangzhou Metro Line 11 (under construction) Target entity description: Guangzhou Metro Line 11 (under construction) is a planned circular rapid transit line in Guangzhou designed to connect multiple central districts, including Tianhe, and enhance network capacity and interchange options across the city’s metro system.
-
A.
Ho Chi Minh City Metro (under construction)
The Ho Chi Minh City Metro is a developing rapid transit system intended to provide modern urban rail service and alleviate traffic congestion in Vietnam’s largest city.
-
B.
Guangzhou Metro Line 7
Guangzhou Metro Line 7 is a rapid transit line in Guangzhou’s metro system that connects key southern districts and transport hubs, including Guangzhou South Railway Station.
-
C.
Guangzhou Metro Line 22
Guangzhou Metro Line 22 is a high-speed rapid transit line in Guangzhou designed to provide fast regional connections between major transport hubs and urban districts.
-
D.
Guangzhou Metro Line 5
Guangzhou Metro Line 5 is a major east–west rapid transit line in Guangzhou’s metro system, connecting key urban districts and serving as an important high-capacity commuter corridor.
-
E.
Shenzhen Metro Line 11
Shenzhen Metro Line 11 is a high-speed, express metro line in Shenzhen that connects the city center with key districts and Shenzhen Bao'an International Airport.
- F. None of above. chosen
Statements (47)
| Predicate | Object |
|---|---|
| instanceOf |
circle line
ⓘ
metro line ⓘ transport infrastructure project under construction ⓘ |
| connectsDistrict |
Baiyun District
NERFINISHED
ⓘ
Haizhu District NERFINISHED ⓘ Liwan District NERFINISHED ⓘ Panyu District NERFINISHED ⓘ Tianhe District NERFINISHED ⓘ Yuexiu District NERFINISHED ⓘ |
| country | China ⓘ |
| designedTo |
connect multiple central districts of Guangzhou
ⓘ
enhance network capacity of Guangzhou Metro ⓘ improve interchange options between metro lines ⓘ |
| hasAlternativeName |
Guangzhou Metro Circular Line
NERFINISHED
ⓘ
Line 11 of Guangzhou Metro NERFINISHED ⓘ |
| hasCharacter | underground ⓘ |
| hasElectrification | overhead line ⓘ |
| hasFunction |
orbital distribution of passenger flows
ⓘ
relief of congestion on radial lines ⓘ urban mass transit ⓘ |
| hasInterchangeRole | orbital transfer corridor ⓘ |
| hasLanguageOfName | Chinese ⓘ |
| hasShape | circular ⓘ |
| hasSystem | rapid transit ⓘ |
| hasTrackGauge | standard gauge ⓘ |
| intendedServiceArea | central Guangzhou urban area ⓘ |
| isPlannedAs | circular line around central Guangzhou ⓘ |
| locatedIn |
China
ⓘ
Guangdong Province ⓘ Guangzhou ⓘ |
| networkRole | central ring line of Guangzhou Metro NERFINISHED ⓘ |
| operator | Guangzhou Metro Group NERFINISHED ⓘ |
| owner | Guangzhou Municipal Government NERFINISHED ⓘ |
| partOf | Guangzhou Metro NERFINISHED ⓘ |
| plannedToInterchangeWith |
Guangzhou Metro Line 1
NERFINISHED
ⓘ
Guangzhou Metro Line 10 NERFINISHED ⓘ Guangzhou Metro Line 2 NERFINISHED ⓘ Guangzhou Metro Line 3 NERFINISHED ⓘ Guangzhou Metro Line 4 NERFINISHED ⓘ Guangzhou Metro Line 5 NERFINISHED ⓘ Guangzhou Metro Line 6 NERFINISHED ⓘ Guangzhou Metro Line 7 NERFINISHED ⓘ Guangzhou Metro Line 8 NERFINISHED ⓘ Guangzhou-Foshan Metro lines NERFINISHED ⓘ |
| planningAuthority | Guangzhou Municipal Planning authorities NERFINISHED ⓘ |
| status | under construction ⓘ |
| transportMode | rail ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Subject: Guangzhou Metro Line 11 (under construction) Description of subject: Guangzhou Metro Line 11 (under construction) is a planned circular rapid transit line in Guangzhou designed to connect multiple central districts, including Tianhe, and enhance network capacity and interchange options across the city’s metro system.
Referenced by (1)
Full triples — surface form annotated when it differs from this entity's canonical label.