Triple
T28052936
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Guangzhou Metro Line 11 |
E708876
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transport infrastructure project under construction |
C2938
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transport infrastructure project under construction Context triple: [Guangzhou Metro Line 11, instanceOf, transport infrastructure project under construction]
-
A.
infrastructure project
chosen
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
B.
toll road project
A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
-
C.
unfinished building project
An unfinished building project is a partially constructed structure where work has been halted before completion, leaving it unusable for its intended purpose.
-
D.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
-
E.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef9b6df9f48190bbb971d02cbe1b65 |
completed | April 27, 2026, 5:22 p.m. |
Created at: April 27, 2026, 8:34 p.m.