NPF-57

E236576

NPF-57 is the U.S. Nuclear Regulatory Commission operating license designation assigned to the Hope Creek Nuclear Generating Station.

All labels observed (1)

Label Occurrences
NPF-57 canonical 1

How this entity was disambiguated

Statements (49)

Predicate Object
instanceOf NRC operating license
U.S. nuclear power plant operating license
appliesToFacility Hope Creek Nuclear Generating Station
appliesToReactorUnit Hope Creek Unit 1
associatedSite Hope Creek Nuclear Generating Station
surface form: Salem-Hope Creek nuclear generating site
coolingWaterSourceLicensed Delaware River
country United States of America
surface form: United States
electricalOutputCategory large commercial nuclear power plant
emergencyPlanningRequirement offsite emergency planning zone for Hope Creek
enforcementAuthority NRC Office of Enforcement
environmentalReviewBasis Hope Creek Nuclear Generating Station
surface form: NRC environmental impact statements for Hope Creek
fuelTypeLicensed low-enriched uranium fuel
gridConnectionPurpose baseload electricity generation
inspectionAuthority NRC Region I
isLinkedToDocumentType NRC license docket
NRC safety evaluation report
technical specifications document
licenseCategory power reactor license
licensee PSEG Power
surface form: PSEG Nuclear LLC

Public Service Enterprise Group
licenseScope commercial power reactor operation
licenseStatus active
licenseType full-power operating license
modificationControl license amendment process for Hope Creek
oversightProgram NRC Reactor Oversight Process
plantDesignClass BWR-4 or similar GE BWR design
publicInformationSource NRC public document room records for Hope Creek license NPF-57
qualityAssuranceRequirement quality assurance program for Hope Creek
radiologicalProtectionRequirement radiation protection program at Hope Creek
reactorTypeLicensed boiling water reactor
reactorVendorLicensed General Electric
recordsRequirement operating records retention for Hope Creek
regulatesActivity operation of Hope Creek Nuclear Generating Station
possession and use of special nuclear material at Hope Creek
production of electricity from nuclear fission at Hope Creek
regulatoryAuthority U.S. Nuclear Regulatory Commission
reportingRequirement event and condition reporting to NRC
requiresComplianceWith 10 CFR Part 20
10 CFR Part 50
Hope Creek Nuclear Generating Station
surface form: NRC technical specifications for Hope Creek
safetyBasis NRC regulations in Title 10 of the Code of Federal Regulations
technical specifications for Hope Creek Nuclear Generating Station
safetySystemsLicensed emergency core cooling systems at Hope Creek
securityRequirement physical security plan for Hope Creek
siteCountry United States of America
surface form: United States
siteCounty Salem County, New Jersey NERFINISHED
siteLocation Lower Alloways Creek Township, New Jersey
siteState New Jersey, United States
surface form: New Jersey
thermalPowerLimit licensed maximum reactor thermal power for Hope Creek

How these facts were elicited

Referenced by (1)

Full triples — surface form annotated when it differs from this entity's canonical label.