Triple
T9756928
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NPF-57 |
E236576
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | U.S. nuclear power plant operating license |
C27229
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: U.S. nuclear power plant operating license Context triple: [NPF-57, instanceOf, U.S. nuclear power plant operating license]
-
A.
U.S. Department of Energy facility
A U.S. Department of Energy facility is a government-operated or -contracted site dedicated to research, development, production, storage, or management of energy-related technologies, nuclear materials, and associated national security and environmental activities.
-
B.
Tennessee Valley Authority facility
A Tennessee Valley Authority facility is any physical installation, plant, dam, office, or infrastructure site owned, operated, or managed by the Tennessee Valley Authority for power generation, environmental stewardship, or regional development.
-
C.
nuclear energy law
Nuclear energy law is the body of legal rules, regulations, and international agreements that govern the safe, secure, and peaceful use, regulation, and oversight of nuclear materials, facilities, and activities.
-
D.
nuclear weapons component plant
A nuclear weapons component plant is an industrial facility dedicated to designing, manufacturing, and assembling specialized parts and subsystems used in the construction and maintenance of nuclear weapons.
-
E.
nuclear reactor
A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84d64f6c8190a4ed4e9f5936eda5 |
completed | March 30, 2026, 2:12 p.m. |
Created at: March 30, 2026, 8:24 p.m.