Triple
T9756952
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NPF-57 |
E236576
|
entity |
| Predicate | requiresComplianceWith |
P5499
|
FINISHED |
| Object |
NRC technical specifications for Hope Creek
The NRC technical specifications for Hope Creek are the regulatory operating and safety requirements established by the U.S. Nuclear Regulatory Commission for the Hope Creek nuclear generating station.
|
E46443
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NRC technical specifications for Hope Creek | Statement: [NPF-57, requiresComplianceWith, NRC technical specifications for Hope Creek]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: NRC technical specifications for Hope Creek Context triple: [NPF-57, requiresComplianceWith, NRC technical specifications for Hope Creek]
-
A.
Hope Creek Nuclear Generating Station
Hope Creek Nuclear Generating Station is a single-unit boiling water nuclear power plant located in Lower Alloways Creek Township, New Jersey, that generates electricity for the regional grid.
-
B.
Calvert Cliffs Nuclear Power Plant
Calvert Cliffs Nuclear Power Plant is a two-unit pressurized water nuclear power station on the western shore of the Chesapeake Bay that generates electricity for the Mid-Atlantic region.
-
C.
Seabrook Station Nuclear Power Plant
Seabrook Station Nuclear Power Plant is a commercial nuclear power facility in Seabrook, New Hampshire, known for its large pressurized water reactor and significant role in the region’s electricity generation.
-
D.
Rules for Inservice Inspection of Nuclear Power Plant Components
Rules for Inservice Inspection of Nuclear Power Plant Components is a key section of the ASME Boiler and Pressure Vessel Code that establishes requirements for the periodic examination, testing, and maintenance of nuclear power plant components to ensure their continued safety and integrity.
-
E.
Rules for Construction of Nuclear Facility Components
Rules for Construction of Nuclear Facility Components is a section of the ASME Boiler and Pressure Vessel Code that sets design, fabrication, and quality assurance standards for components used in nuclear power and related facilities.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: NRC technical specifications for Hope Creek Triple: [NPF-57, requiresComplianceWith, NRC technical specifications for Hope Creek]
Generated description
The NRC technical specifications for Hope Creek are the regulatory operating and safety requirements established by the U.S. Nuclear Regulatory Commission for the Hope Creek nuclear generating station.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: NRC technical specifications for Hope Creek Target entity description: The NRC technical specifications for Hope Creek are the regulatory operating and safety requirements established by the U.S. Nuclear Regulatory Commission for the Hope Creek nuclear generating station.
-
A.
Hope Creek Nuclear Generating Station
chosen
Hope Creek Nuclear Generating Station is a single-unit boiling water nuclear power plant located in Lower Alloways Creek Township, New Jersey, that generates electricity for the regional grid.
-
B.
Calvert Cliffs Nuclear Power Plant
Calvert Cliffs Nuclear Power Plant is a two-unit pressurized water nuclear power station on the western shore of the Chesapeake Bay that generates electricity for the Mid-Atlantic region.
-
C.
Seabrook Station Nuclear Power Plant
Seabrook Station Nuclear Power Plant is a commercial nuclear power facility in Seabrook, New Hampshire, known for its large pressurized water reactor and significant role in the region’s electricity generation.
-
D.
Rules for Inservice Inspection of Nuclear Power Plant Components
Rules for Inservice Inspection of Nuclear Power Plant Components is a key section of the ASME Boiler and Pressure Vessel Code that establishes requirements for the periodic examination, testing, and maintenance of nuclear power plant components to ensure their continued safety and integrity.
-
E.
Rules for Construction of Nuclear Facility Components
Rules for Construction of Nuclear Facility Components is a section of the ASME Boiler and Pressure Vessel Code that sets design, fabrication, and quality assurance standards for components used in nuclear power and related facilities.
- F. None of above.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84d64f6c8190a4ed4e9f5936eda5 |
completed | March 30, 2026, 2:12 p.m. |
| NER | Named-entity recognition | batch_69cd9fb2889481908fba4a449d5007fe |
completed | April 1, 2026, 10:44 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d1b035c32c8190ad65f3d57d53a317 |
completed | April 5, 2026, 12:43 a.m. |
| NEDg | Description generation | batch_69d1b0dde93881908fcec28de9cfa99d |
completed | April 5, 2026, 12:46 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69d1b1bbe6108190af17b75f79c0f465 |
completed | April 5, 2026, 12:50 a.m. |
Created at: March 30, 2026, 8:24 p.m.