Plan-Do-Check-Act cycle
E100883
continuous improvement cycle
environmental management framework
management methodology
process improvement model
quality management framework
The Plan-Do-Check-Act cycle is a continuous quality and environmental management improvement framework that guides organizations through planning, implementing, reviewing, and refining their processes.
All labels observed (5)
| Label | Occurrences |
|---|---|
| Plan-Do-Check-Act cycle canonical | 6 |
| Deming cycle | 1 |
| Deming wheel | 1 |
| PDCA cycle | 1 |
| Shewhart cycle | 1 |
Statements (54)
| Predicate | Object |
|---|---|
| instanceOf |
continuous improvement cycle
ⓘ
environmental management framework ⓘ management methodology ⓘ process improvement model ⓘ quality management framework ⓘ |
| ActPhaseIncludes |
initiating new improvement cycles
ⓘ
standardizing successful changes ⓘ |
| associatedWithPerson |
W. Edwards Deming
ⓘ
Walter A. Shewhart ⓘ |
| basedOnConcept |
feedback loop
ⓘ
scientific method ⓘ |
| characterizedAs |
cyclical process
ⓘ
iterative framework ⓘ |
| CheckPhaseIncludes |
comparing results with objectives
ⓘ
measuring results ⓘ |
| DoPhaseIncludes |
conducting pilot tests
ⓘ
implementing planned changes ⓘ |
| emphasizes |
corrective action
ⓘ
data-driven decision making ⓘ iterative improvement ⓘ preventive action ⓘ root cause analysis ⓘ standardization ⓘ |
| hasAlternativeName |
Plan-Do-Check-Act cycle
ⓘ
surface form:
Deming cycle
Plan-Do-Check-Act cycle ⓘ
surface form:
Deming wheel
Plan-Do-Check-Act cycle ⓘ
surface form:
PDCA cycle
Plan-Do-Check-Act cycle ⓘ
surface form:
Shewhart cycle
|
| hasPhase |
Act
ⓘ
Check ⓘ Do ⓘ Plan ⓘ |
| PlanPhaseIncludes |
analyzing current processes
ⓘ
developing improvement plans ⓘ identifying problems ⓘ setting objectives ⓘ |
| supports |
compliance management
ⓘ
management review ⓘ performance monitoring ⓘ |
| usedFor |
continuous improvement
ⓘ
environmental performance improvement ⓘ problem solving ⓘ process optimization ⓘ quality improvement ⓘ risk management ⓘ |
| usedInDomain |
environmental management
ⓘ
manufacturing ⓘ occupational health and safety management ⓘ project management ⓘ quality management ⓘ service management ⓘ software development ⓘ |
| usedInStandard |
ISO 14001
ⓘ
ISO 45001 ⓘ ISO 9001 ⓘ |
Referenced by (10)
Full triples — surface form annotated when it differs from this entity's canonical label.
this entity surface form:
PDCA cycle
this entity surface form:
Deming cycle
this entity surface form:
Deming wheel
this entity surface form:
Shewhart cycle
Annex SL high-level structure for ISO management system standards
→
basedOn
→
Plan-Do-Check-Act cycle
ⓘ