Triple

T928397
Position Surface form Disambiguated ID Type / Status
Subject Space Shuttle Discovery E20037 entity
Predicate lastFlight P7187 FINISHED
Object STS-133
STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
E112005 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-133 | Statement: [Space Shuttle Discovery, lastFlight, STS-133]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-133
Context triple: [Space Shuttle Discovery, lastFlight, STS-133]
  • A. STS-135
    STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
  • B. STS-125
    STS-125 was NASA’s final Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, extending its scientific capabilities and operational life.
  • C. STS-114
    STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
  • D. STS-109
    STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
  • E. STS-103
    STS-103 was a NASA Space Shuttle Discovery mission in 1999 dedicated to repairing and upgrading the Hubble Space Telescope to extend its operational life and scientific capabilities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-133
Triple: [Space Shuttle Discovery, lastFlight, STS-133]
Generated description
STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: STS-133
Target entity description: STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • A. STS-135
    STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
  • B. STS-125
    STS-125 was NASA’s final Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, extending its scientific capabilities and operational life.
  • C. STS-114
    STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
  • D. STS-109
    STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
  • E. STS-103
    STS-103 was a NASA Space Shuttle Discovery mission in 1999 dedicated to repairing and upgrading the Hubble Space Telescope to extend its operational life and scientific capabilities.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493af3dc48190adb7263e6e445ea1 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4b34775ac8190aabbd047a36cec6b completed March 1, 2026, 9:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69a933a103908190a624039492079f82 completed March 5, 2026, 7:41 a.m.
NEDg Description generation batch_69a94d60cb3c81908dc3af7bc395505f completed March 5, 2026, 9:31 a.m.
NED2 Entity disambiguation (via description) batch_69a963c897888190bec5decc6010c9d6 completed March 5, 2026, 11:06 a.m.
Created at: March 1, 2026, 7:40 p.m.