Triple

T9250158
Position Surface form Disambiguated ID Type / Status
Subject IEC 60870‑5‑101 E222300 entity
Predicate relatedTo P37 FINISHED
Object IEC 60870‑5‑103
IEC 60870‑5‑103 is an international communication protocol standard used for telecontrol of protection equipment and substation control systems in electrical power networks.
E790994 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: IEC 60870‑5‑103 | Statement: [IEC 60870‑5‑101, relatedTo, IEC 60870‑5‑103]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: IEC 60870‑5‑103
Context triple: [IEC 60870‑5‑101, relatedTo, IEC 60870‑5‑103]
  • A. IEC 60870‑5‑101
    IEC 60870‑5‑101 is an international standard defining basic telecontrol communication protocols for monitoring and controlling electrical power systems over serial links.
  • B. IEC 60870‑5‑104
    IEC 60870‑5‑104 is an international standard defining networked telecontrol communication protocols for supervisory control and data acquisition (SCADA) systems over TCP/IP in electrical power systems.
  • C. IEC 60870
    IEC 60870 is an international standard defining protocols for telecontrol and supervisory control and data acquisition (SCADA) systems in electrical power and industrial automation.
  • D. IEC 61850
    IEC 61850 is an international standard that defines communication protocols and data models for automation, protection, and control systems in electrical substations and power utility networks.
  • E. IEC 61334
    IEC 61334 is an international standard that defines protocols and requirements for low-speed power line communication used in utility and smart grid applications.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: IEC 60870‑5‑103
Triple: [IEC 60870‑5‑101, relatedTo, IEC 60870‑5‑103]
Generated description
IEC 60870‑5‑103 is an international communication protocol standard used for telecontrol of protection equipment and substation control systems in electrical power networks.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: IEC 60870‑5‑103
Target entity description: IEC 60870‑5‑103 is an international communication protocol standard used for telecontrol of protection equipment and substation control systems in electrical power networks.
  • A. IEC 60870‑5‑101
    IEC 60870‑5‑101 is an international standard defining basic telecontrol communication protocols for monitoring and controlling electrical power systems over serial links.
  • B. IEC 60870‑5‑104
    IEC 60870‑5‑104 is an international standard defining networked telecontrol communication protocols for supervisory control and data acquisition (SCADA) systems over TCP/IP in electrical power systems.
  • C. IEC 60870
    IEC 60870 is an international standard defining protocols for telecontrol and supervisory control and data acquisition (SCADA) systems in electrical power and industrial automation.
  • D. IEC 61850
    IEC 61850 is an international standard that defines communication protocols and data models for automation, protection, and control systems in electrical substations and power utility networks.
  • E. IEC 61334
    IEC 61334 is an international standard that defines protocols and requirements for low-speed power line communication used in utility and smart grid applications.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca841d2b18819089f9faf5b2c2aec0 completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd05f7e9848190939f9199d0c1a572 completed April 1, 2026, 11:48 a.m.
NED1 Entity disambiguation (via context triple) batch_69d0c72be25c8190931204b21966502e completed April 4, 2026, 8:09 a.m.
NEDg Description generation batch_69d0c850d65c8190b2bf5da194466dd7 completed April 4, 2026, 8:14 a.m.
NED2 Entity disambiguation (via description) batch_69d0ca3b77e081908fdcc1aafaf2344a completed April 4, 2026, 8:22 a.m.
Created at: March 30, 2026, 7:31 p.m.