Triple
T8014796
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kalinin nuclear power plant |
E186584
|
entity |
| Predicate | gridConnectionYear |
P34483
|
FINISHED |
| Object | 1984 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1984 | Statement: [Kalinin nuclear power plant, gridConnectionYear, 1984]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: gridConnectionYear Context triple: [Kalinin nuclear power plant, gridConnectionYear, 1984]
-
A.
gridConnectionCompletionDate
chosen
Indicates the date on which a connection to the electrical grid is fully completed and becomes operational.
-
B.
yearOfOriginalInstallation
Indicates the specific calendar year when something was first installed or put into initial operation.
-
C.
electrificationYear
Indicates the year in which something (such as a system, facility, or infrastructure) was converted to or equipped for electric power.
-
D.
recordAnnualGenerationYear
Indicates the year in which an entity’s annual generation (e.g., production or output) is recorded.
-
E.
electrificationUsedBetween
Indicates that an electrification system or method is applied or present along the segment or connection between two entities.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca82ac7fc081909b1398cf025423af |
completed | March 30, 2026, 2:03 p.m. |
| NER | Named-entity recognition | batch_69cb3df24e4c8190ae1c46e97e54787d |
completed | March 31, 2026, 3:22 a.m. |
| PD | Predicate disambiguation | batch_69cb048c9f488190b4fb8917a9c21bc5 |
completed | March 30, 2026, 11:17 p.m. |
Created at: March 30, 2026, 5:19 p.m.