Triple
T7887392
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kenneth D. Bowersox |
E183136
|
entity |
| Predicate | spaceMission |
P68
|
FINISHED |
| Object |
STS-113
STS-113 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2002 that delivered the P1 truss segment and rotated the station’s Expedition crew.
|
E701254
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-113 | Statement: [Kenneth D. Bowersox, spaceMission, STS-113]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS-113 Context triple: [Kenneth D. Bowersox, spaceMission, STS-113]
-
A.
STS-112
STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
-
B.
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
-
C.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
-
D.
STS-117
STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
-
E.
STS-116
STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-113 Triple: [Kenneth D. Bowersox, spaceMission, STS-113]
Generated description
STS-113 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2002 that delivered the P1 truss segment and rotated the station’s Expedition crew.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: STS-113 Target entity description: STS-113 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2002 that delivered the P1 truss segment and rotated the station’s Expedition crew.
-
A.
STS-112
STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
-
B.
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
-
C.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
-
D.
STS-117
STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
-
E.
STS-116
STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca828af6e48190a06ee7010d8f0e64 |
completed | March 30, 2026, 2:02 p.m. |
| NER | Named-entity recognition | batch_69cb39d97460819089e37169813af5c2 |
completed | March 31, 2026, 3:04 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cb5b98f9b88190b25b5c23a9ae9ced |
completed | March 31, 2026, 5:28 a.m. |
| NEDg | Description generation | batch_69cb7631d10881908e3c7dacb98520cd |
completed | March 31, 2026, 7:22 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69cbbf847f3c819092d690d8d65f6d60 |
completed | March 31, 2026, 12:35 p.m. |
Created at: March 30, 2026, 4:59 p.m.