Triple

T7887392
Position Surface form Disambiguated ID Type / Status
Subject Kenneth D. Bowersox E183136 entity
Predicate spaceMission P68 FINISHED
Object STS-113
STS-113 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2002 that delivered the P1 truss segment and rotated the station’s Expedition crew.
E701254 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-113 | Statement: [Kenneth D. Bowersox, spaceMission, STS-113]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-113
Context triple: [Kenneth D. Bowersox, spaceMission, STS-113]
  • A. STS-112
    STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
  • B. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • C. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • D. STS-117
    STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • E. STS-116
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-113
Triple: [Kenneth D. Bowersox, spaceMission, STS-113]
Generated description
STS-113 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2002 that delivered the P1 truss segment and rotated the station’s Expedition crew.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: STS-113
Target entity description: STS-113 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2002 that delivered the P1 truss segment and rotated the station’s Expedition crew.
  • A. STS-112
    STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
  • B. STS-110
    STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • C. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • D. STS-117
    STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
  • E. STS-116
    STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca828af6e48190a06ee7010d8f0e64 completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cb39d97460819089e37169813af5c2 completed March 31, 2026, 3:04 a.m.
NED1 Entity disambiguation (via context triple) batch_69cb5b98f9b88190b25b5c23a9ae9ced completed March 31, 2026, 5:28 a.m.
NEDg Description generation batch_69cb7631d10881908e3c7dacb98520cd completed March 31, 2026, 7:22 a.m.
NED2 Entity disambiguation (via description) batch_69cbbf847f3c819092d690d8d65f6d60 completed March 31, 2026, 12:35 p.m.
Created at: March 30, 2026, 4:59 p.m.