STS-113
E701254
STS-113 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2002 that delivered the P1 truss segment and rotated the station’s Expedition crew.
All labels observed (2)
| Label | Occurrences |
|---|---|
| STS-113 canonical | 1 |
| STS-113 crew | 1 |
How this entity was disambiguated
This entity first appeared as the object of triple T7887392 — resolving that mention is where its identity was fixed. The disambiguator weighed these candidate entities and picked the highlighted one (or “None”, minting a new entity). This is how homonymy is resolved: the same surface form can point to different entities.
Target entity: STS-113 Context triple: [Kenneth D. Bowersox, spaceMission, STS-113]
-
A.
STS-112
STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
-
B.
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
-
C.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
-
D.
STS-117
STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
-
E.
STS-116
STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Target entity: STS-113 Target entity description: STS-113 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2002 that delivered the P1 truss segment and rotated the station’s Expedition crew.
-
A.
STS-112
STS-112 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S1 truss segment as part of the station’s structural framework.
-
B.
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
-
C.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
-
D.
STS-117
STS-117 was a 2007 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S3/S4 truss segment and solar arrays as part of the station’s assembly.
-
E.
STS-116
STS-116 was a 2006 Space Shuttle Discovery mission to the International Space Station that delivered and reconfigured key structural and power components as part of the station’s assembly.
- F. None of above. chosen
Statements (37)
| Predicate | Object |
|---|---|
| instanceOf |
NASA spaceflight
ⓘ
Space Shuttle mission ⓘ |
| associatedStationModule | Integrated Truss Structure NERFINISHED ⓘ |
| callsign | Endeavour NERFINISHED ⓘ |
| cargo |
science experiments
ⓘ
supplies for ISS ⓘ |
| countryOfOperator |
United States of America
ⓘ
surface form:
United States
|
| crewSize | 7 ⓘ |
| deliveredTo | International Space Station NERFINISHED ⓘ |
| destination | International Space Station NERFINISHED ⓘ |
| EVAcount | 3 ⓘ |
| EVApurpose |
ISS maintenance
ⓘ
installation of P1 truss ⓘ |
| expeditionCrewRotation |
Expedition 5
NERFINISHED
ⓘ
Expedition 6 NERFINISHED ⓘ |
| followedBy | STS-107 NERFINISHED ⓘ |
| landingDate | 2002-12-07 ⓘ |
| landingSite | Kennedy Space Center Shuttle Landing Facility NERFINISHED ⓘ |
| launchDate | 2002-11-23 ⓘ |
| launchSite | Kennedy Space Center Launch Complex 39A ⓘ |
| launchVehicle | Space Shuttle Endeavour NERFINISHED ⓘ |
| missionDuration | 13 days ⓘ |
| missionType |
ISS assembly mission
ⓘ
crew rotation mission ⓘ |
| objective |
deliver P1 truss to ISS
ⓘ
rotate ISS Expedition crew ⓘ |
| operator | NASA ⓘ |
| orbit | Low Earth orbit NERFINISHED ⓘ |
| partOf | ISS assembly sequence NERFINISHED ⓘ |
| precededBy | STS-112 NERFINISHED ⓘ |
| primaryPayload | P1 truss segment ⓘ |
| program |
NASA Space Shuttle program
ⓘ
surface form:
Space Shuttle program
|
| spaceAgency | NASA ⓘ |
| spacecraft | Space Shuttle Endeavour NERFINISHED ⓘ |
| spacecraftType | orbiter ⓘ |
| visited | International Space Station NERFINISHED ⓘ |
| yearOfSpaceflight | 2002 ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Subject: STS-113 Description of subject: STS-113 was a NASA Space Shuttle Endeavour mission to the International Space Station in 2002 that delivered the P1 truss segment and rotated the station’s Expedition crew.
Referenced by (2)
Full triples — surface form annotated when it differs from this entity's canonical label.