Triple

T7823823
Position Surface form Disambiguated ID Type / Status
Subject Spencer de Grey E181195 entity
Predicate notableWork P4 FINISHED
Object Wembley Stadium redevelopment design team (Foster + Partners with others)
Wembley Stadium redevelopment design team (Foster + Partners with others) is the architectural consortium led by Foster + Partners that created the modern design for the rebuilt Wembley Stadium in London.
E695207 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Wembley Stadium redevelopment design team (Foster + Partners with others) | Statement: [Spencer de Grey, notableWork, Wembley Stadium redevelopment design team (Foster + Partners with others)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Wembley Stadium redevelopment design team (Foster + Partners with others)
Context triple: [Spencer de Grey, notableWork, Wembley Stadium redevelopment design team (Foster + Partners with others)]
  • A. Wembley National Stadium Limited
    Wembley National Stadium Limited is the company responsible for managing and operating England’s national football stadium at Wembley.
  • B. Rogers Stirk Harbour + Partners
    Rogers Stirk Harbour + Partners is a renowned British architectural practice known for its high-tech, sustainable designs and landmark projects around the world.
  • C. Aston Webb Building
    The Aston Webb Building is a prominent historic red-brick centerpiece of the University of Birmingham’s Edgbaston campus, known for its grand domed architecture and role as a focal point for university ceremonies and administration.
  • D. O2 Arena (interior redesign)
    O2 Arena (interior redesign) is the modernized interior of London’s iconic multi-purpose entertainment venue, reconfigured to enhance spectator experience, flexibility, and capacity for major concerts and events.
  • E. Wembley Central
    Wembley Central is a railway and London Underground station in northwest London that provides transport links between central London and the Wembley area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Wembley Stadium redevelopment design team (Foster + Partners with others)
Triple: [Spencer de Grey, notableWork, Wembley Stadium redevelopment design team (Foster + Partners with others)]
Generated description
Wembley Stadium redevelopment design team (Foster + Partners with others) is the architectural consortium led by Foster + Partners that created the modern design for the rebuilt Wembley Stadium in London.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Wembley Stadium redevelopment design team (Foster + Partners with others)
Target entity description: Wembley Stadium redevelopment design team (Foster + Partners with others) is the architectural consortium led by Foster + Partners that created the modern design for the rebuilt Wembley Stadium in London.
  • A. Wembley National Stadium Limited
    Wembley National Stadium Limited is the company responsible for managing and operating England’s national football stadium at Wembley.
  • B. Rogers Stirk Harbour + Partners
    Rogers Stirk Harbour + Partners is a renowned British architectural practice known for its high-tech, sustainable designs and landmark projects around the world.
  • C. Aston Webb Building
    The Aston Webb Building is a prominent historic red-brick centerpiece of the University of Birmingham’s Edgbaston campus, known for its grand domed architecture and role as a focal point for university ceremonies and administration.
  • D. O2 Arena (interior redesign)
    O2 Arena (interior redesign) is the modernized interior of London’s iconic multi-purpose entertainment venue, reconfigured to enhance spectator experience, flexibility, and capacity for major concerts and events.
  • E. Wembley Central
    Wembley Central is a railway and London Underground station in northwest London that provides transport links between central London and the Wembley area.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8282ccec819083c48efb72d21cf9 completed March 30, 2026, 2:02 p.m.
NER Named-entity recognition batch_69cafa0abff08190b0245ceca5f20cae completed March 30, 2026, 10:32 p.m.
NED1 Entity disambiguation (via context triple) batch_69cb14aefd4881908ffa5825f4ba6eff completed March 31, 2026, 12:26 a.m.
NEDg Description generation batch_69cb1734159881909590ed51e8920387 completed March 31, 2026, 12:37 a.m.
NED2 Entity disambiguation (via description) batch_69cb1a6fc16c8190827593f58b9d742d completed March 31, 2026, 12:50 a.m.
Created at: March 30, 2026, 4:42 p.m.