Wembley Stadium redevelopment design team (Foster + Partners with others)
E695207
Wembley Stadium redevelopment design team (Foster + Partners with others) is the architectural consortium led by Foster + Partners that created the modern design for the rebuilt Wembley Stadium in London.
All labels observed (1)
| Label | Occurrences |
|---|---|
| Wembley Stadium redevelopment design team (Foster + Partners with others) canonical | 1 |
How this entity was disambiguated
This entity first appeared as the object of triple T7823823 — resolving that mention is where its identity was fixed. The disambiguator weighed these candidate entities and picked the highlighted one (or “None”, minting a new entity). This is how homonymy is resolved: the same surface form can point to different entities.
Target entity: Wembley Stadium redevelopment design team (Foster + Partners with others) Context triple: [Spencer de Grey, notableWork, Wembley Stadium redevelopment design team (Foster + Partners with others)]
-
A.
Wembley National Stadium Limited
Wembley National Stadium Limited is the company responsible for managing and operating England’s national football stadium at Wembley.
-
B.
Rogers Stirk Harbour + Partners
Rogers Stirk Harbour + Partners is a renowned British architectural practice known for its high-tech, sustainable designs and landmark projects around the world.
-
C.
Aston Webb Building
The Aston Webb Building is a prominent historic red-brick centerpiece of the University of Birmingham’s Edgbaston campus, known for its grand domed architecture and role as a focal point for university ceremonies and administration.
-
D.
O2 Arena (interior redesign)
O2 Arena (interior redesign) is the modernized interior of London’s iconic multi-purpose entertainment venue, reconfigured to enhance spectator experience, flexibility, and capacity for major concerts and events.
-
E.
Wembley Central
Wembley Central is a railway and London Underground station in northwest London that provides transport links between central London and the Wembley area.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Target entity: Wembley Stadium redevelopment design team (Foster + Partners with others) Target entity description: Wembley Stadium redevelopment design team (Foster + Partners with others) is the architectural consortium led by Foster + Partners that created the modern design for the rebuilt Wembley Stadium in London.
-
A.
Wembley National Stadium Limited
Wembley National Stadium Limited is the company responsible for managing and operating England’s national football stadium at Wembley.
-
B.
Rogers Stirk Harbour + Partners
Rogers Stirk Harbour + Partners is a renowned British architectural practice known for its high-tech, sustainable designs and landmark projects around the world.
-
C.
Aston Webb Building
The Aston Webb Building is a prominent historic red-brick centerpiece of the University of Birmingham’s Edgbaston campus, known for its grand domed architecture and role as a focal point for university ceremonies and administration.
-
D.
O2 Arena (interior redesign)
O2 Arena (interior redesign) is the modernized interior of London’s iconic multi-purpose entertainment venue, reconfigured to enhance spectator experience, flexibility, and capacity for major concerts and events.
-
E.
Wembley Central
Wembley Central is a railway and London Underground station in northwest London that provides transport links between central London and the Wembley area.
- F. None of above. chosen
Statements (31)
| Predicate | Object |
|---|---|
| instanceOf |
architectural consortium
ⓘ
design team ⓘ |
| activity |
architectural design
ⓘ
redevelopment planning ⓘ stadium masterplanning ⓘ |
| associatedProject | construction of the new Wembley Stadium opened in 2007 ⓘ |
| associatedWith | Wembley Stadium NERFINISHED ⓘ |
| basedIn | London NERFINISHED ⓘ |
| client | Wembley National Stadium Limited NERFINISHED ⓘ |
| collaborationForm | consortium ⓘ |
| country | United Kingdom ⓘ |
| designedFeature |
bowl configuration of the rebuilt Wembley Stadium
ⓘ
external appearance of the rebuilt Wembley Stadium ⓘ overall architectural concept of the rebuilt Wembley Stadium ⓘ spectator facilities of the rebuilt Wembley Stadium ⓘ |
| field |
architecture
ⓘ
sports venue design ⓘ stadium architecture ⓘ |
| focus |
modernisation of Wembley Stadium
ⓘ
replacement of the old Wembley Stadium structure ⓘ |
| includes | Foster + Partners NERFINISHED ⓘ |
| leader | Foster + Partners NERFINISHED ⓘ |
| ledBy | Foster + Partners NERFINISHED ⓘ |
| locatedInProject | Wembley Park area NERFINISHED ⓘ |
| notableWork | redesign of Wembley Stadium ⓘ |
| project | Wembley Stadium redevelopment ⓘ |
| projectLocation | Wembley, London NERFINISHED ⓘ |
| projectType | sports stadium redevelopment ⓘ |
| purpose | to create the modern design for the rebuilt Wembley Stadium ⓘ |
| role | architect for Wembley Stadium redevelopment ⓘ |
| timePeriod | late 1990s–2000s ⓘ |
How these facts were elicited
The pipeline generated the facts above by prompting gpt-5.1 with this entity's name + description and the instruction below.
You are a knowledge base construction expert. Given a subject entity and a description of it, return factual statements that you know for the subject as a JSON list of dictionaries(triples), where keys must be "subject", "predicate" and "object". The number of facts may be very high, between 25 to 50 or more, for very popular subjects. For less popular subjects, the number of facts can be very low, like 5 or 10. # Requirements - If you don't know the subject at all, return an empty list. - If the subject is not a named entity, return an empty list. - Include at least one triple where predicate is "instanceOf". - Do not get too wordy. - Separate several objects into multiple triples with one object.
Subject: Wembley Stadium redevelopment design team (Foster + Partners with others) Description of subject: Wembley Stadium redevelopment design team (Foster + Partners with others) is the architectural consortium led by Foster + Partners that created the modern design for the rebuilt Wembley Stadium in London.
Referenced by (1)
Full triples — surface form annotated when it differs from this entity's canonical label.