Triple

T737815
Position Surface form Disambiguated ID Type / Status
Subject von Neumann algebra E14972 entity
Predicate closedUnder P19426 FINISHED
Object adjoint operation LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: adjoint operation | Statement: [von Neumann algebra, closedUnder, adjoint operation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: closedUnder
Context triple: [von Neumann algebra, closedUnder, adjoint operation]
  • A. closedIn
    Indicates that one entity is enclosed, contained, or surrounded within the boundaries or limits defined by another entity.
  • B. closed
    Indicates that an entity has brought something (such as an object, container, or space) from an open state into a shut or sealed state, or that it is currently in that shut state.
  • C. closedDuring
    Indicates that an entity is not open or available for use during a specified time period or under certain conditions.
  • D. closureReason
    Indicates the reason or cause for which an entity, process, or case has been closed or terminated.
  • E. closureProcess
    Indicates the procedure or set of actions carried out to formally conclude, finalize, or terminate an ongoing activity, case, or process.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4934d9930819099eed80096b0597d completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a4a64adf2c81908e48090be35dd9d9 completed March 1, 2026, 8:49 p.m.
PD Predicate disambiguation batch_69a4a4fc734c81908fbd36386d5746d6 completed March 1, 2026, 8:43 p.m.
PDg Predicate description generation batch_69a4a64957ec81909fe2e2dbffd80ed3 completed March 1, 2026, 8:49 p.m.
Created at: March 1, 2026, 7:37 p.m.