Triple

T588536
Position Surface form Disambiguated ID Type / Status
Subject New Croton Dam E17213 entity
Predicate catchmentArea P15963 FINISHED
Object Croton River watershed E1836 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Croton River watershed | Statement: [New Croton Dam, catchmentArea, Croton River watershed]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Croton River watershed
Context triple: [New Croton Dam, catchmentArea, Croton River watershed]
  • A. Croton River chosen
    The Croton River is a river in southeastern New York that flows through Westchester and Putnam counties and is a key source for New York City's Croton water supply system.
  • B. Caroni River
    The Caroni River is a significant river in southeastern Venezuela known for its hydroelectric potential and for flowing through the Guayana region before joining the Orinoco.
  • C. Rio Hato
    Rio Hato is a coastal area in Panama known for its airfield, which was a key target during the U.S. invasion of Panama in Operation Just Cause.
  • D. Guayas River
    The Guayas River is a major waterway in western Ecuador that flows through the coastal lowlands and the city of Guayaquil before emptying into the Pacific Ocean.
  • E. Spanish River
    The Spanish River is a river in northeastern Ontario, Canada, that flows through a series of lakes and forests before emptying into Lake Huron.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: catchmentArea
Context triple: [New Croton Dam, catchmentArea, Croton River watershed]
  • A. hasCatchmentArea
    Indicates that a geographic or administrative unit serves as the area from which an entity (such as a facility or service) draws its users, resources, or influence.
  • B. areaServed
    Indicates the geographic region or jurisdiction within which a service, organization, or activity is provided or applicable.
  • C. targetArea
    Indicates the specific area or region that is the intended focus or destination of an action or effect.
  • D. representedArea
    Indicates that one entity serves as a representation or depiction of a particular area or region.
  • E. hasAreaType
    Indicates that an entity is associated with a specific kind or classification of area (e.g., urban, rural, coastal).
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49379d09c8190ac7e00b24e2810b1 completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a49b9d1e68819096a9b5e7b2e83d6e completed March 1, 2026, 8:03 p.m.
NED1 Entity disambiguation (via context triple) batch_69a5c389eb708190911de8a28e55ab7f completed March 2, 2026, 5:06 p.m.
PD Predicate disambiguation batch_69a494ca68448190a516b9c3525d8916 completed March 1, 2026, 7:34 p.m.
PDg Predicate description generation batch_69a4985ada988190aaea628a9b55bca4 completed March 1, 2026, 7:49 p.m.
Created at: March 1, 2026, 7:33 p.m.