Triple
T5723147
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dual Contracts |
E126196
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | New York City Subway expansion program |
C14631
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: New York City Subway expansion program Context triple: [Dual Contracts, instanceOf, New York City Subway expansion program]
-
A.
New York City Subway infrastructure project
chosen
A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
-
B.
Long Island Rail Road project
A Long Island Rail Road project is a coordinated initiative to plan, construct, upgrade, or maintain LIRR infrastructure, services, or operations to improve rail transportation for its riders and communities.
-
C.
New York City Subway–railroad interchange
A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
-
D.
New York City Subway tunnel
A New York City Subway tunnel is an underground passageway engineered to safely guide subway trains, utilities, and related infrastructure beneath the city’s surface between stations.
-
E.
division of Metropolitan Transportation Authority
A division of the Metropolitan Transportation Authority is an organizational unit responsible for managing and operating a specific set of transit services, assets, or functions within the broader MTA system.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c0082f723881908ce8bb13a0c0f8b7 |
completed | March 22, 2026, 3:18 p.m. |
Created at: March 22, 2026, 3:46 p.m.