Triple

T5723147
Position Surface form Disambiguated ID Type / Status
Subject Dual Contracts E126196 entity
Predicate instanceOf P0 FINISHED
Object New York City Subway expansion program C14631 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: New York City Subway expansion program
Context triple: [Dual Contracts, instanceOf, New York City Subway expansion program]
  • A. New York City Subway infrastructure project chosen
    A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
  • B. Long Island Rail Road project
    A Long Island Rail Road project is a coordinated initiative to plan, construct, upgrade, or maintain LIRR infrastructure, services, or operations to improve rail transportation for its riders and communities.
  • C. New York City Subway–railroad interchange
    A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
  • D. New York City Subway tunnel
    A New York City Subway tunnel is an underground passageway engineered to safely guide subway trains, utilities, and related infrastructure beneath the city’s surface between stations.
  • E. division of Metropolitan Transportation Authority
    A division of the Metropolitan Transportation Authority is an organizational unit responsible for managing and operating a specific set of transit services, assets, or functions within the broader MTA system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c0082f723881908ce8bb13a0c0f8b7 completed March 22, 2026, 3:18 p.m.
Created at: March 22, 2026, 3:46 p.m.