Triple

T5457605
Position Surface form Disambiguated ID Type / Status
Subject surface-barrier transistor E122517 entity
Predicate instanceOf P0 FINISHED
Object high-speed transistor C18112 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-speed transistor
Context triple: [surface-barrier transistor, instanceOf, high-speed transistor]
  • A. CMOS microprocessor
    A CMOS microprocessor is a central processing unit implemented using complementary metal-oxide-semiconductor technology, providing high integration, low power consumption, and reliable digital computation on a single chip.
  • B. bipolar junction transistor configuration
    A bipolar junction transistor configuration is a specific arrangement of a BJT’s terminals and external components (such as common-emitter, common-base, or common-collector) that determines its input-output relationships, gain characteristics, and typical application in electronic circuits.
  • C. transistor configuration
    A transistor configuration is a specific way of connecting a transistor’s terminals (such as common emitter, common base, or common collector) that determines its input-output relationships, gain characteristics, and typical applications in electronic circuits.
  • D. hardware accelerator
    A hardware accelerator is a specialized computing device or component designed to perform specific tasks or algorithms more efficiently and faster than a general-purpose processor.
  • E. high-power DC fast charging system
    A high-power DC fast charging system is an electrical infrastructure that delivers large amounts of direct current at high voltage and current levels to rapidly recharge electric vehicle batteries, typically reducing charging times to minutes instead of hours.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd46424248819085282ddf50a565f3 completed March 20, 2026, 1:06 p.m.
Created at: March 20, 2026, 2:08 p.m.