Triple

T5086991
Position Surface form Disambiguated ID Type / Status
Subject Pongal E114660 entity
Predicate isPreparedDuringMonth P14304 FINISHED
Object Thai LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Thai | Statement: [Pongal, isPreparedDuringMonth, Thai]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isPreparedDuringMonth
Context triple: [Pongal, isPreparedDuringMonth, Thai]
  • A. hasMonth
    Indicates that something is associated with, occurs in, or is assigned to a specific month.
  • B. appliesDuringMonths chosen
    Indicates that something is valid, active, or in effect only during specific months of the year.
  • C. hasVariableMonth
    Indicates that something is associated with or occurs in a month that can change rather than being fixed.
  • D. isFinalMonthOf
    Indicates that one time period is the last month within the duration or lifecycle of another specified period or process.
  • E. announcedInMonth
    Indicates that an announcement or declaration occurred during a specified calendar month.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69bd443e941881908eb4e8c685b6f656 completed March 20, 2026, 12:57 p.m.
NER Named-entity recognition batch_69bd751fb6dc8190be674c92a17e8c0e completed March 20, 2026, 4:26 p.m.
PD Predicate disambiguation batch_69bd7159adc881909effd4382c395c66 completed March 20, 2026, 4:10 p.m.
Created at: March 20, 2026, 1:40 p.m.