Triple
T4408879
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New Labour project |
E94801
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | political project |
C15944
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: political project Context triple: [New Labour project, instanceOf, political project]
-
A.
political proposal
A political proposal is a formally articulated plan or set of measures put forward by a political actor or group to address public issues, change policies, or introduce new legislation.
-
B.
political work
Political work is the organized set of activities aimed at influencing, shaping, or implementing public policy, governance, and collective decision-making within a society.
-
C.
political movement
A political movement is a collective effort by a group of people, often organized around shared ideas or grievances, seeking to influence or change government policies, social structures, or political power.
-
D.
political issue
A political issue is a topic or problem related to governance, public policy, or societal values that generates debate and requires collective decision-making or action.
-
E.
political organization
A political organization is a structured group of individuals who collectively pursue specific political goals, such as influencing public policy, gaining or maintaining power, or representing particular interests within a political system.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69b34539638c8190abfea3eb29425210 |
completed | March 12, 2026, 10:59 p.m. |
Created at: March 12, 2026, 11:28 p.m.