Triple

T38449440
Position Surface form Disambiguated ID Type / Status
Subject Panama Canal construction planning and organization E912129 entity
Predicate instanceOf P0 FINISHED
Object large-scale engineering planning C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: large-scale engineering planning
Context triple: [Panama Canal construction planning and organization, instanceOf, large-scale engineering planning]
  • A. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. civil engineering landmark
    A civil engineering landmark is a significant structure or project—such as a bridge, dam, tunnel, or roadway—that exemplifies notable achievement, innovation, or historical importance in the field of civil engineering.
  • C. work on regional planning
    Work on regional planning involves the coordinated analysis, design, and management of land use, infrastructure, and resources across a defined geographic area to promote sustainable, balanced, and equitable development.
  • D. urban planning master plan
    An urban planning master plan is a comprehensive, long-term framework that guides the physical, social, and economic development of a city or region through coordinated land use, infrastructure, and policy strategies.
  • E. military engineering system
    A military engineering system is an integrated framework of technologies, processes, and organizational structures designed to plan, construct, maintain, and protect military infrastructure and capabilities in support of defense operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e84e2dc81908badf05b3aafa9ea completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:31 p.m.