Triple

T37288189
Position Surface form Disambiguated ID Type / Status
Subject Indian Pacific E925589 entity
Predicate trackElectrification P392 FINISHED
Object non-electrified for most of the route LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: non-electrified for most of the route | Statement: [Indian Pacific, trackElectrification, non-electrified for most of the route]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: trackElectrification
Context triple: [Indian Pacific, trackElectrification, non-electrified for most of the route]
  • A. electrification chosen
    Indicates the process or state of providing electrical power or converting something to operate using electricity.
  • B. railElectrificationIncludes
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • C. isElectrificationPlanned
    Indicates that there is an intention or scheduled plan to add or upgrade electrical infrastructure or services to the referenced entity or area.
  • D. electrificationEnd
    Indicates the point in time or event at which an electrification process or electrified state comes to an end.
  • E. electrificationUsedBy
    Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eafe20c8190856d3b996a4c31a7 completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_69fcc7338120819081cb46547d60f2cb completed May 7, 2026, 5:09 p.m.
PD Predicate disambiguation batch_69fcc58566a0819082d5ea36e03bf0c6 completed May 7, 2026, 5:01 p.m.
Created at: May 3, 2026, 4:16 p.m.