Triple
T36677583
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | London sewer system |
E905584
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | sanitation infrastructure |
C63550
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: sanitation infrastructure Context triple: [London sewer system, instanceOf, sanitation infrastructure]
-
A.
sanitation survey
A sanitation survey is a systematic assessment that collects and analyzes data on hygiene practices, waste management, water quality, and sanitation facilities within a community or setting to evaluate public health conditions and identify areas for improvement.
-
B.
Urban sanitation mission
Urban sanitation mission is a coordinated program aimed at improving cleanliness, waste management, and hygiene infrastructure in cities to ensure a healthy and sustainable urban environment.
-
C.
sanitation campaign
A sanitation campaign is a coordinated public effort aimed at improving hygiene practices, waste management, and environmental cleanliness to protect community health.
-
D.
water and sanitation sector assessment
A water and sanitation sector assessment is a systematic evaluation of the availability, quality, accessibility, management, and sustainability of water supply and sanitation services within a defined area or population.
-
E.
sanitation equipment manufacturer
A sanitation equipment manufacturer is a company that designs, produces, and supplies machinery and devices used for cleaning, disinfecting, and maintaining hygienic conditions in various environments such as public facilities, healthcare, and industry.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e7011dc819082b324f18b756a1b |
completed | May 3, 2026, 3:49 p.m. |
Created at: May 3, 2026, 4:12 p.m.