Triple

T36677580
Position Surface form Disambiguated ID Type / Status
Subject London sewer system E905584 entity
Predicate instanceOf P0 FINISHED
Object sewer system C38026 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: sewer system
Context triple: [London sewer system, instanceOf, sewer system]
  • A. sewer utility
    A sewer utility is an organization or system responsible for collecting, transporting, treating, and safely disposing of wastewater and sewage from homes, businesses, and industries.
  • B. water supply system
    A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
  • C. wastewater outfall tunnel chosen
    A wastewater outfall tunnel is an underground conduit that transports treated or untreated wastewater from collection or treatment facilities to a designated discharge point, typically in a river, lake, or ocean.
  • D. public water access system
    A public water access system is an infrastructure and management framework that provides communities with safe, reliable, and equitable access to potable water through shared sources such as taps, fountains, and distribution points.
  • E. water infrastructure
    Water infrastructure encompasses the systems, facilities, and networks designed to source, treat, store, distribute, and manage water and wastewater for human, industrial, and environmental needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e7011dc819082b324f18b756a1b completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:12 p.m.