Triple

T36165828
Position Surface form Disambiguated ID Type / Status
Subject AEM-7 E1045993 entity
Predicate finalAmtrakRetirement P198126 FINISHED
Object 2016 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2016 | Statement: [AEM-7, finalAmtrakRetirement, 2016]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalAmtrakRetirement
Context triple: [AEM-7, finalAmtrakRetirement, 2016]
  • A. introducedByAmtrak
    Indicates that something (such as a service, policy, feature, or change) was initiated, launched, or brought into use by Amtrak.
  • B. serviceResumedAsAmtrakTerminus
    Indicates that train service has been restarted at a station, with that station now functioning as the endpoint (terminus) for Amtrak operations on the route.
  • C. reopenedAsAmtrakStation
    Indicates that a previously closed station was reopened specifically to serve as an Amtrak station.
  • D. retiredFromCanadianPacificService
    Indicates that an entity has ended its period of service or employment with the Canadian Pacific organization.
  • E. statusAfterShuttleRetirement
    Indicates the condition or state of an entity that holds after the retirement of the space shuttle program.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e396bc88190b99d221bff9be27a completed May 3, 2026, 3:48 p.m.
NER Named-entity recognition batch_69fecb4d02f881909a9ee97ce98000d5 completed May 9, 2026, 5:51 a.m.
PD Predicate disambiguation batch_69fec9846c1c8190b317f0711f0755db completed May 9, 2026, 5:43 a.m.
PDg Predicate description generation batch_69fecb4be24481908bda6197d7fc32f4 completed May 9, 2026, 5:51 a.m.
Created at: May 3, 2026, 4:08 p.m.