Triple

T35158339
Position Surface form Disambiguated ID Type / Status
Subject Luna E-7 series E1015189 entity
Predicate instanceOf P0 FINISHED
Object series of robotic lunar lander spacecraft C31914 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: series of robotic lunar lander spacecraft
Context triple: [Luna E-7 series, instanceOf, series of robotic lunar lander spacecraft]
  • A. series of robotic lunar probes chosen
    A series of robotic lunar probes is a coordinated set of unmanned spacecraft missions designed to explore, study, and collect data from the Moon’s surface, subsurface, and environment.
  • B. unmanned lunar lander
    An unmanned lunar lander is a robotic spacecraft designed to descend from lunar orbit and safely touch down on the Moon’s surface to conduct scientific experiments, deploy instruments, or support future missions without a human crew onboard.
  • C. lunar rover
    A lunar rover is a mobile robotic vehicle designed to traverse, explore, and conduct scientific experiments on the surface of the Moon.
  • D. planetary lander technology demonstrator
    A planetary lander technology demonstrator is a prototype spacecraft designed to test and validate key landing systems, instruments, and operations for future missions to planetary surfaces.
  • E. asteroid lander
    An asteroid lander is a spacecraft designed to descend onto and operate on the surface of an asteroid, conducting scientific measurements, sampling, and in some cases resource prospecting.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ddb3a708190b521ba2970b17178 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:02 p.m.