Triple
T34771595
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | L0 Series maglev trainsets |
E1002376
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | maglev trainset |
C36733
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: maglev trainset Context triple: [L0 Series maglev trainsets, instanceOf, maglev trainset]
-
A.
maglev railway line
A maglev railway line is a transportation route equipped with magnetic levitation and guidance systems that enable high-speed, low-friction train travel along a dedicated track.
-
B.
monorail rolling stock
Monorail rolling stock comprises the specialized rail vehicles designed to operate on a single-rail guideway, including powered trains and unpowered cars used for passenger or freight transport.
-
C.
high-speed test train
chosen
A high-speed test train is a specialized railway vehicle designed to operate at very high velocities to evaluate, validate, and optimize track infrastructure, signaling systems, and rolling stock performance under extreme operating conditions.
-
D.
automated guideway transit line
An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
-
E.
elevated railway
An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76db20dac8190b1e8d0ca4dc1d59f |
completed | May 3, 2026, 3:45 p.m. |
Created at: May 3, 2026, 3:59 p.m.