Triple
T32284844
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Illusion-O ghost viewer |
E824797
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | theatrical viewing device |
C18558
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: theatrical viewing device Context triple: [Illusion-O ghost viewer, instanceOf, theatrical viewing device]
-
A.
cinema apparatus
A cinema apparatus is the integrated system of technologies, practices, and viewing conditions that together produce and structure the experience of watching films.
-
B.
viewing platform
A viewing platform is an elevated, often open structure designed to provide people with a safe, unobstructed vantage point for observing the surrounding environment or specific points of interest.
-
C.
demonstration device
chosen
A demonstration device is a tangible or virtual tool specifically designed to illustrate, explain, or showcase how a concept, process, or system works in an accessible and observable way.
-
D.
single-screen theater
A single-screen theater is a movie venue that features only one auditorium, showing one film at a time to all its patrons.
-
E.
film projector
A film projector is a device that shines light through a moving strip of film and uses lenses to project the resulting sequence of images onto a screen, creating the illusion of motion.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3490f404081908450db66884f4334 |
completed | April 30, 2026, 12:20 p.m. |
Created at: May 1, 2026, 12:43 a.m.