Triple

T3062916
Position Surface form Disambiguated ID Type / Status
Subject Harvey O. Banks Pumping Plant E62036 entity
Predicate instanceOf P0 FINISHED
Object State Water Project facility C1458 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: State Water Project facility
Context triple: [Harvey O. Banks Pumping Plant, instanceOf, State Water Project facility]
  • A. municipal water supply facility
    A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
  • B. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • C. multipurpose dam
    A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
  • D. irrigation dam
    An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
  • E. water management project chosen
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85793e5c8190a358049bc4a98d8c completed March 8, 2026, 2:19 p.m.
Created at: March 8, 2026, 3:02 p.m.